Similar Projects
Upgrade or Ventilation Fy22 NRM
Alteration
Design
$1,000,000 to $5,000,000 est. value
Loma Linda, CA 92354

Minor Professional HVAC Repairs
Term Contract
Bidding
Santa Rosa, CA

HVAC Installation and Energy Infrastructure
Alteration
Bidding
Union City, CA

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

City Hall Building HVAC Upgrades
Results
Less than $125,000 est. value
Santa Clarita, CA 91355

Better Way Electrical Service or HVAC Project
Alteration
Results
$100,000 to $300,000 est. value
Yuba City, CA 95991

Henry Robinson Multi-Purpose Center HVAC Replacement
Alteration
Bidding
$650,000 est. value
Oakland, CA 94612

HVAC Replacement
Term Contract
Post-Bid
$24,000 to $29,000 est. value
Alameda, CA

EMS Upgrades at the Main Library
Alteration
Results
$347,500 est. value
Burlingame, CA 94010

Job Order Contracts - Mechanical Works (HVAC)
Alteration
Bidding
$5,000,000 est. value
San Mateo, CA

Heat Pump Replacement
Term Contract
Post-Bid
Santa Cruz, CA 95060

Replacement of Jail Rooftop HVAC 1-6
Alteration
Results
$810,000 est. value
San Rafael, CA 94903

Highland Hospital Koret Building Exhaust Fan and Waterproofing
Alteration
Bidding
$1,900,000 est. value
Oakland, CA

HVAC on Call Maintenance and Repair Services
Alteration
Post-Bid
CA

Last Updated 12/28/2021 04:35 AM
Project Title

El Parador Apartments Corridor Ventilation Upgrade

Physical Address View project details and contacts
City, State (County) Campbell, CA 95008   (Santa Clara County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes demolition and disposal of existing systems and supply and install new complete HVAC systems at each wing on each floor. The new HVAC systems will be completely functional with ducts, and diffusers. The first and second floor ceilings are mostly T-Bar- Grid with tiles in between except one location at the Second-floor Zone C where the ceiling is sheet rock. The third-floor ceiling is sheet rock with accessible attic. The work includes exterior and interior repairs.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents