Similar Projects
Annual Standby Emergency Pumping Contract
Term Contract
Bidding
Pine Knoll Shores, NC

Dutchman Creek Pump Station
Bidding
$471,000 est. value
Yadkin Valley, NC

Well House Repairs
Post-Bid
Santeetlah, NC

Ground Source Heating Pump, Fort Bragg NC.
Post-Bid
Fort Bragg, NC 28307

Domestic Water Booster Pump Installation
Results
Raleigh, NC

Y--Replace Potable Water Wells and Install Raw Water Main
Results
$1,000,000 to $5,000,000 est. value
Cherry Point, NC 28533

Replace Existing Raw Water Pump Project
Bidding
Kings Mountain, NC

Raw Water Wells
Post-Bid
Laurinburg, NC 28353

N--BIA Cherokee Agency_Heat Pump Replacement
Results
Less than $25,000 est. value
Cherokee, NC 28719

Contract III - 2020 USDA Well Building Improvements
Post-Bid
Red Springs, NC 28377

Grease Trap and Lift Station Pumping for Columbus Correctional
Term Contract
Results
Raleigh, NC

Monitoring Well Abandonment
Post-Bid
NC

Raw Water Intake Improvements
Results
Raleigh, NC

Raw Water Pump and Motor
Post-Bid
Camp Lejeune, NC

Sailfish Street Water Supply Well
Results
Currituck, NC

Last Updated 07/31/2020 09:40 AM
Project Title

Bypass Pumping for Declared Emergencies

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28216   (Mecklenburg County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Providing pumps and equipment for gravity sewer collection system/sewage, lift stations, dewatering of large excavation areas, and various process units at the Water Treatment Plants (WTP) and Wastewater Treatment Plants (WWTP) on an as-needed basis. Stationary bypass pumping is needed at plant locations and mobile bypass pumping is needed for field service orders. Currently, the largest gravity line is 96 inches in diameter. Typical size for gravity line pipes in the field is 8-24 inches.

Details

Division 22 - Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents