Similar Projects
Seal Coat
Infrastructure
Sub-Bidding
$1,570,000 CJ est. value
Fargo, ND 58102

ECRWD - Facility Expansion
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Thompson, ND 58278

Concrete Pavement Repair
Infrastructure
Post-Bid
$800,000 CJ est. value
Wahpeton, ND 58075

Airfield Pavement Slurry Seal
Infrastructure
Results
$231,443 CJ est. value
Edgeley, ND 58433

Milling, HMA Overlay, Curb Ramps, CPR, Curb, and Lighting Improvements
Infrastructure
Results
$1,258,354 CJ est. value
Courtenay, ND 58426

Paving and Rehab/reconstruction
Infrastructure
Construction
$2,947,620 CJ est. value
Fargo, ND 58102

Greenhouse Concrete Replacement
Infrastructure
Post-Bid
$800,000 CJ est. value
Fargo, ND 58102

Micro-Mill, Slurry Seal and Micro Surfacing
Infrastructure
Results
$1,717,611 CJ est. value
New Salem, ND 58563

Far - South Ga Apron Reconstruction
Infrastructure
Post-Bid
$400,000 CJ est. value
Fargo, ND 58102

Water, Sewer, Storm and Street Improvement District No. 2022-11 Cub Creek 2nd Addition
Infrastructure
Results
$16,111,086 CJ est. value
Horace, ND 58047

2023 CP No. 4 Street, Sidewalk & ADA Improvements
Infrastructure
Post-Bid
$1,363,000 CJ est. value
Grand Forks, ND 58203

Chip Seal
Infrastructure
Results
$719,921 CJ est. value
Beach, ND 58621

Eastview FEMA Repairs
Infrastructure
Post-Bid
$400,000 CJ est. value
Larimore, ND 58251

Milling and RAP Hot Mix Asphalt Overlay
Infrastructure
Results
$2,634,830 CJ est. value
Valley City, ND 58072

Construct Deicing Containment Area
New Construction, Infrastructure
Post-Bid
$900,000 CJ est. value
Williston, ND 58801

Last Updated 02/14/2024 09:41 AM
Project Title

District No. 6-23 Paving Improvements and District No. 7-23 Paving Improvements and Seal Coat Patching

Physical Address View project details and contacts
City, State (County) Grafton, ND 58237   (Walsh County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,795,340 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 12, 2023, project was awarded to Knife River Materials, awarded amount is $2,790,247.03** Description: the construction of District No. 6-23 And District No. 7-23 Paving Improvements And Seal Coat Patching . HMA Pavement, Curb & Gutter, ADA Improvements, Utility Repair, Waterline Replacement, Bituminous Seal Coat Patching and Incidentals CONTRACT BOND, 1 L SUM; REMOVAL OF TREES 10IN, 1 EA; REMOVAL OF PIPE ALL TYPES AND SIZES, 167 LF; REMOVAL OF CONCRETE PAVEMENT, 51 SY; REMOVAL OF CONCRETE SIDEWALK/DRIVEWAY, 315 SY; REMOVAL OF CURB & GUTTER, 2,004 LF; REMOVE & SALVAGE AGGREGATE, 8,671 SY; COMMON EXCAVATION-SUBCUT, 300 CY; COMMON EXCAVATION-WASTE, 260 CY; FIBER ROLLS 12IN, 3,170 LF; REMOVAL OF FIBER ROLLS 12IN, 1,585 LF; EROSION CONTROL, 1 L SUM; RIPRAP GRADE II, 9 CY; AGGREGATE BASE COURSE CL 5, 6,042 TON; MILLING PAVEMENT SURFACE, 40,054 SY; COMMERCIAL GRADE HOT MIX ASPHALT, 429 TON; SUPERPAVE FAA 43, 6,271 TON; MOBILIZATION, 1 L SUM; 8IN REINF CONCRETE PAVEMENT CL AE, 49 SY; TRAFFIC CONTROL, 3 L SUM; GEOSYNTHETIC MATERIAL TYPE R1, 9,558 SY; CURB & GUTTER, 1,969 LF; SIDEWALK CONCRETE 4IN, 311 SY; DETECTABLE WARNING PANELS, 268 SF; ADJUST MANHOLE, 16 EA; ADJUST MANHOLE - FLOATING CASTING, 13 EA; ADJUST GATE VALVE, 11 EA; LANDSCAPE PREPARATION, 1,036 SY; UTILITY REPAIRS 1-18, 18 L SUM; SERVICE LINE CONNECTION - WATER, 8 EA; SERVICE LINE CONNECTION - SANITARY SEWER, 8 EA; GATE VALVE REPLACEMENT, 2 EA; INSTALL GATE VALVE, 2 EA; ALPHA TEE REPLACEMENT, 2 EA; WATERMAIN REPLACEMENT, 368 LF; TOPSOIL, 296 CY; TOPSOIL IMPORTED, 1,029 CY; SEEDING CL III, 1.1 ACRE; HYDRAULIC MULCH, 2.2 ACRE; TEMPORARY COVER CROP, 1.1 ACRE; SUBGRADE PREPARATION TYPE A - 12IN, 25.7 STA; STORM SEWER PIPE 12", 1,207 LF; INLET CATCH BASIN, 4 EA; PVMT MK PAINTED-MESSAGE, 43 SF; PVMT MK PAINTED 4IN LINE, 862 LF ALT A GEOSYNTHETIC MATERIAL TYPE G, 9,558 SY substantially complete - August 19th, 2023 ; Final Completion- September 30th, 2023. Question Deadline 05/15/2023 Information / Clarification shall be submitted in writing by Email.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents