Similar Projects
Power and Small Auto Transformer
Bidding
Austin, TX

Del Rio Lighting
Bidding
Austin, TX 78773

Mold Removal and Remediation at Austin State Supported Living Center
Demolition
Post-Bid
Less than $382,328 est. value
Austin, TX 78756

Photovoltaic Power Systems and Component
Term Contract
Post-Bid
Austin, TX 78759

Austin, TX ATCT DCD/HVAC Replacement
Results
$1,000,000 to $5,000,000 est. value
Austin, TX 78719

Generator Hydrogen Fast Purge Systems, Sand Hill
Results
Del Valle, TX 78617

Electrical Services
Bidding
Austin, TX 78701

Campus Switch Upgrades
Post-Bid
Austin, TX 78703

Substation Control Switches and Lock-Out Relays
Results
Less than $3,500,000 est. value
Austin, TX 78767

Generator Repair
Bidding
Austin, TX 78701

Steiner Elementary HVAC Update
Post-Bid
Austin, TX 78732

Air Filter Changing Services
Results
Less than $122,790 est. value
Austin, TX 78711

HVAC and Roof Replacement Project
Term Contract
Post-Bid
Austin, TX 78746

Generator Inspection Services
Results
Less than $19,792 est. value
Austin, TX 78701

District UPS Replacement
Post-Bid
Pflugerville, TX 78660

Last Updated 09/16/2020 08:37 AM
Project Title

HVAC and Electrical Improvements at Maplewood Elementary School

Physical Address View project details and contacts
City, State (County) Austin, TX 78722   (Travis County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $479,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK: Electrical Distribution System Upgrades –Replace existing panels MDP and 5P with new panes DP1 and panel P to be located within the mechanical area of the building below the first-floor level. Install new panel L in the gym electrical room to provide service for the RTU’s. Heating and Air Conditioning Improvements – Remove 12 ground source heat pump console units and install 12 packaged RTU’s to serve classrooms. Provide with new gas line service from meter and condensate disposal to landscape. Remove abandoned mechanical equipment above the corridor ceiling. Remove and replace corridor ceiling with new LED lights. Provide extension of corridor walls to deck with 1-hour partition to separate the ceiling plenum of the classroom from the corridor. Remove and replace a strip of VCT flooring along the exterior walls of the classroom where console units are being removed. Abate the flooring in the electrical room and denoted classrooms. Provide clean concrete floor in electrical room with transition strip at corridor floor junction.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents