Similar Projects
Replacement of AHU 9 - Halifax Health 4th Floor CVOR
Bidding
Daytona Beach, FL 32116

Halifax Health T-Zone Air Handling Unit Replacement
Post-Bid
Daytona Beach, FL 32100

Seabreeze High School HVAC, Ceiling and Lighting Building 1
Post-Bid
Daytona Beach, FL 32118

FDOT HVAC Install: Sneads WB Weigh Station
Results

Lakeside HVAC and Ceiling Replacement
Results
Less than $400,000 est. value
Port Orange, FL 32129

HVAC and Mechanical Products
Term Contract
Post-Bid

Direct Replacement of 60 Ton Chiller and Two 30 Ton Air Handlers
Results
Daytona Beach Shores, FL 32116

Seabreeze High School HVAC Renovation Building 2
Post-Bid
Daytona Beach, FL 32118

Emergency Vehicle Exhaust Extraction System
Term Contract
Results
Less than $80,000 est. value
De Land, Lake Helen, New Smyrna Beach, FL 32169

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Upgrade CEP Controls and AHU Dampers - New Smyrna Beach High
Results
Less than $520,000 est. value
New Smyrna Beach, FL 32168

Pine Ridge High School HVAC Renovation
Post-Bid
Daytona Beach, Deltona, FL 32116

HVAC Condensing Unit Replacement
Results
Less than $450,000 est. value
Daytona Beach, FL 32114

Indian River Elementary School - Replace Chiller Building 7
Results
Less than $150,000 est. value
Edgewater, FL 32141

Campbell Middle School - Campus Wide HVAC
Results
Less than $770,000 est. value
Daytona Beach, FL 32114

Last Updated 01/28/2020 04:40 AM
Project Title

Peabody Lobby HVAC Replacement

Physical Address View project details and contacts
City, State (County) Daytona Beach, FL 32114   (Volusia County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $45,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of removal and disposal of existing air handlers and condensers that supply the lobby area of the Peabody Auditorium and the supplying and installation of the new air handlers and condensers. The order of magnitude for this project is $45,000.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents