Similar Projects
Fire Station #4 Construction
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Branson, MO 65616

Shepherd of the Hills Fish Hatchery Conservation Center Replacement
Demolition, New Construction, Infrastructure
Bidding
$7,200,000 CJ est. value
Branson, MO 65616

The Cliffs at Long Creek
New Construction, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Ridgedale, MO 65739

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Mountain Home Road Closure/Repair
Term Contract
Post-Bid
Bull Shoals, Mountain Home, AR 72653

2021 Mill, Overlay, Patch, Repair and Striping of Various Streets
Infrastructure
Results
Branson, MO

Housing Authority Parking Lot Improvements
Infrastructure
Results
Branson, MO

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Resurface
Infrastructure
Results
$1,000,000 to $15,000,000 est. value

Compton Wastewater Treatment Plant Flood Protection Wall - City of Branson
Infrastructure
Post-Bid
$2,599,000 CJ est. value
Branson, MO 65616

Job Order Contract for Concrete Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

Woodland II Apartments
New Construction, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Forsyth, MO 65653

Table Rock State Park RTP Trail Paving Project
Infrastructure
Post-Bid
$700,000 CJ est. value
Branson, MO 65616

Last Updated 12/02/2022 05:06 PM
Project Title

Asphalt Paving , Sealcoat and Striping

Physical Address View project details and contacts
City, State (County) Hollister, MO 65672   (Taney County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $225,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Hollister R-V School District is seeking bids for asphalt repair and maintenance for the spring of 2023. Hollister School District (College) is seeking proposals from qualified contractors (Contractor) for asphalt paving of roadways and sealcoat and striping of parking lots on the campus. For inquiries regarding this RFP contact:Dr. Sean WoodsAssistant Superintendent1914 St Hwy BBHollister, MO 65672417.243.4005swoods@hollisterschools.com The school district reserves the right to reject any and all proposals and to waive informalities.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents