Similar Projects
Replace Condensing and Evaporator Coil and Related Piping and Electrical Work
Alteration
Post-Bid
$15,000 est. value
Dudley, MA

Hot Water System Controls Upgrade
Alteration
Post-Bid
Northbridge, MA 01588

Plumbing and Related Service
Term Contract
Results
$120,000 est. value
Westborough, MA

Plumbing Work - Parking Garage
Alteration
Results
Leominster, MA 01453

Roof Replacement Project
Alteration
Post-Bid
$5,000,000 est. value
Worcester, MA 01606

Plumbing Work Required to Bring an Underground Parking Garage
Alteration
Results
Leominster, MA 01453

Maintenance Plumbing Services / WPS(Worcester Public School) and City
Alteration
Post-Bid
$65,000 est. value
Worcester, MA

Interior Sanitary Line Replacement - Filed Sub-Bids
Alteration
Results
$182,000 est. value
Millbury, MA 01527

On Call Service Provider for Installation, Maintenance, and Repairs
Alteration
Post-Bid
Gardner, MA

Toilet Installation
Alteration
Results
$125,000 est. value
West Boylston, Worcester, MA 01583

Ductless Split Systems
Renovation
Post-Bid
$30,000 CJ est. value
Gardner, MA 01440

Kitchen Rehab and Replace Hot Water Heater
Alteration
Results
$408,000 est. value
Westborough, MA 01581

Water Heater and Boiler Replacement for Burncoat Junior and Senior High Schools - Sub
Renovation
Post-Bid
$934,183 CJ est. value
Worcester, MA 01606

Millbury High School Domestic Hot Water Tank Replacement
Renovation
Results
$130,000 CJ est. value
Millbury, MA 01527

Administration Building Interior MEP Critical Repairs Lead Piping
Renovation, Infrastructure
Post-Bid
$761,700 CJ est. value
Worcester, MA 01606

Last Updated 04/26/2023 07:26 PM
Project Title

Leicester-Worcester Interconnection Pump Station

Physical Address View project details and contacts
City, State (County) Leicester, MA 01524   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,182,800 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the furnishing and installing of a prefabricated water booster pump station, complete with booster pumps, piping, appurtenances, instrumentation, panels, standby emergency generator, chemical feed pumps, electrical wiring and conduit, heaters, dehumidifiers, blowers, and all other related components. The project also consists of installing electrical service and conduit to the pump station, propane fuel tank and concrete pad, drywell, gravel surfacing, fencing, hydrants, and approximately 300 LF of water main. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The goals for this project are a minimum of 4.20 percent D/MBE participation and 4.50 percent D/WBE participation by certified DBEs. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Mariusz D. Jedrychowski, PE, Senior Project Manager mariusz.jedrychowski@wright-pierce.com Question Deadline 04/10/2023 Work Included: Construction of the Leicester-Worcester Interconnection Pump Station. The major proposed work under this Contract includes: 1. Construction of: a. Prefabricated water booster pump station complete with pumps, piping, appurtenances, instrumentation, panels, standby emergency generator, chemical feed pumps, electrical wiring and conduit, heaters, dehumidifiers, and all related components; b. Electrical service, pole, transformer, and conduit to pump station site; c. Propane fuel tank and concrete equipment pad; d. Site improvements such as grading, gravel surfacing, installation of a site drywell and related drainage piping, fencing and gates; e. Water main with related valves, bends, appurtenances, and connection to proposed water main; and f. All other piping, site work, equipment systems, structures, instrumentation, control and electrical systems, as indicated on the Drawings. g. Other appurtenances as shown on the Drawings and specified herein. 2. Demolition of: a. Existing bituminous curb to the extents shown on the Drawings for the proposed gravel drives; and b. All trees, stumps, and vegetation through clearing and grubbing as indicated on the drawings. B. Related Work Specified Elsewhere: 1. Coordination: Section 01050 2. Construction Schedules: Section 01310. 3. Quality Coordination Meetings: Various sections of the Specifications, including those outlined below. a. Pre-Concrete Meeting (Section 03300) b. Pre-Coatings Meeting (Section 03930) c. Pre-Instrumentation Meeting (Section 13410) d. Pre-Electrical Meeting (Section 16010) C. Removals, Relocations and Rearrangements 1. Examine the existing site for the work of all trades which will influence the cost of the work under the bid. This work shall include removals, relocations and rearrangements which may interfere with, disturb or complicate the performance of the work under the bid involving systems, equipment and related service lines, which shall continue to be utilized as part of the finished project. The Contractor is responsible for all coordination in this regard 2. Provide in the bid a sufficient amount to include all removals, relocations, rearrangements and reconnections herein specified, necessary or required to provide approved operation and coordination of the combined new and existing systems and equipment.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents