Similar Projects
Herndon Metrorail Intermodal Access Improvements Project
New Construction
Bidding
Herndon, VA

Old Courthouse Road Pedestrian Access Improvements
Post-Bid
Vienna, VA

Roberts Road Improvements
Results
$630,757 est. value
Fairfax, VA

Pedestrian and Drainage Project
Results
$4,467,755 est. value
Fairfax, VA

Pickett Shopping Center Roadway Improvements Project
Results
$262,153 est. value
Fairfax, VA 22030

Algonkian Regional Park Accessible Parking and Routes Improvements
Results
Lorton, VA 22079

Trail/Walkway Maintenance Work
Results
Fairfax, VA 22035

Asphalt Trail/Walkway Maintenance in Sully District
Results
Fairfax, VA 22035

Statewide ADA Project Group II
Results
VA

Telegraph Road Walkway
Term Contract
Results
Less than $2,828,432 est. value
VA

Construction Project, CSS# 22935 Repave MEP lot and Replace Fence - Fort Belvoir, VA (VA020)
Results
$500,000 to $1,000,000 est. value
Fort Belvoir, VA 22060

Rolling Road Walkway
Results
VA

Fair Lakes Boulevard Walkway
Results
Fairfax, VA 22035

Meadowlark Gardens ADA Parking and Routes Installation
Results
Vienna, VA

Bull Run Regional Park ADA Accessible Parking and Routes Installation
Results
Centreville, VA

Last Updated 01/09/2020 04:09 PM
Project Title

Chandon Park Trail Improvements

Physical Address View project details and contacts
City, State (County) Herndon, VA 20172   (Fairfax County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate - 07/16/19
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of approximately 1,610 linear feet of eight foot wide asphalt trail to include all necessary stakeout, erosion and sediment control installation and removal, demolition, clearing, tree removal, grading, asphalt paving, curb and gutter and handicap ramp installation, storm water management and storm sewer installation, handrail installation and all other miscellaneous items noted on the construction drawings. Existing sections of the trail will be removed and reconstructed per the plan which includes removal of a small pedestrian bridge.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents