Similar Projects
Reported | 09/16/2020 12:00 AM |
Project Title | Hoey Pump Station Force Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | Long Branch, NJ 07740 (Monmouth County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of: Installation of approximately 4,813 LF of 18" HDPE force main from Hoey Pump Station to discharge point at the existing 24" interceptor located off West End Ave as shown on the plans. The installation in addition to open cut construction includes approximately 100 LF of directional drilling under the existing box culvert near the station, approximately 80 LF of jacking and boring under Cedar Avenue and approximately 75 feet jacking and boring under NJ Transit railroad tracks at Brighton Avenue. Maintenance of sanitary sewer flow including by-pass operations as required to make all necessary connections to the existing sanitary sewer system. Completion of all improvements as required to finalize the new force main installation. Trench restoration and paving roadways as stipulated on the contract documents. Miscellaneous site work, and Restoration of all disturbed areas. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |