Similar Projects
RFP Engineering - Second Creek Farm and Oasis Parks, Trail Fitness Stations and Shade Structures
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Commerce City, CO 80022

Rangeview Gulch Detention - STM 02 - City of Littleton
Infrastructure
Conception
$700,000 CJ est. value
Littleton, CO 80120

Butterfly Pavilion At Baseline
New Construction, Infrastructure - 81,000 SF
Design
$55,000,000 CJ est. value
Westminster, CO 80030

Parterre - Phase 1 - Future Sections
New Construction, Infrastructure
Design
$250,000,000 CJ est. value
Thornton, CO 80229

RFP Engineering - Elm Drive Drainage and Street Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Commerce City, CO 80022

Re-Stripe, Seal, and Maintenance on Parking Garages
Infrastructure
Bidding
$5,000,000 CJ est. value
Aurora, CO 80045

Medical Office Shell Building / Aurora
New Construction, Infrastructure - 11,240 SF
Post-Bid
$2,700,000 CJ est. value
Aurora, CO 80015

CU Denver College of Engineering, Design, and Computing Building and North Classroom Renovations
New Construction, Renovation, Infrastructure - 72,000 SF
Post-Bid
$58,739,000 CJ est. value
Denver, CO 80204

Central Maintenance Facility
Renovation
Results
Aurora, CO 80018

Exterior Attached Shed Rebuild
Renovation
Results
Littleton, CO 80120

Shamrock Foods New Distribution Facility
New Construction - 900,000 SF
Construction
Aurora, CO 80019

Project Tiger
New Construction - 489,200 SF
Construction
$10,000,000 CJ est. value
Aurora, CO 80019

Patten Gray Apartments
New Construction, Infrastructure - 4,200 SF
Pending Verification
$90,000,000 CJ est. value
Denver, CO 80204

King Soopers Fuel at Arapahoe Crossing
Demolition, New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Aurora, CO 80016

ACJC Employee Parking Lot Reconstruction - Arapahoe County
Infrastructure
Conception
$2,036,000 CJ est. value
Englewood, CO 80112

Last Updated 06/14/2023 12:16 PM
Project Title

Blue Sky Self Storage / Ute Pass Self Storage

Physical Address View project details and contacts
City, State (County) Woodland Park, CO 80863   (Teller County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $7,900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

climate controlled, self-storage facility As of June 14, 2023, this project received Conditional Use Permit (CUP) approval from the city and was approved for an extension in 2022. The Site Plan Review application has yet to be submitted. The owner previously stated that a general contractor had been selected; however, the name of the firm has not been disclosed. Although a firm schedule has not been established, construction is not expected to begin before late 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

72,400 SF, 5.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents