Similar Projects
Conte, Main Entrance Skylight Water Infiltration Repairs - Filed Sub-Bids
Sub-Bidding
Less than $179,000 est. value
Amherst, MA

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

J--Plumbing and Pipefitting BOA
Post-Bid

Roof Repairs
Results
Less than $30,000 est. value
Amherst, MA

Roof Replacement, Tobin Manor 667-3
Results
Less than $107,804 est. value
Florence, MA

J--Plumbing and Pipefitting Services BOA
Post-Bid
West Haven, CT - Bedford, Boston, Leeds, MA - Augusta, ME - Manchester, NH - Providence, RI - White River Jct, VT

Roof Repair, Insulation & Weather Stripping - Granby Training Area, 14 Carver Street, Granby, Ma 01033
Results
Granby, MA 01033

Central Heating Plant - Controls Service Contract
Post-Bid
Less than $180,000 est. value
Amherst, MA

2019 Roof Replacement at Furcolo Hall - General Bids
Results
Less than $1,515,772 est. value
Amherst, MA 01002

Information Technology - HVAC System Maintenance
Post-Bid
Less than $45,000 est. value
Hadley, MA

Van Meter 1st Floor ADA Bathrooms - Filed Sub Bids
Results
$360,000 est. value
Hadley, MA

National Roofing Program (NRP) Design/Build Nationwide
Post-Bid

Roof Repairs, Insulation, & Weather Stripping - Granby Training Area, 14 Carver Street, Granby, MA 01033
Results
Less than $25,000 est. value
Granby, MA 01033

HVAC/R Services
Term Contract
Post-Bid
Less than $2,000,000 est. value

Hampshire House - Third Floor HVAC Renovations
Results
Less than $120,000 est. value
Hadley, MA

Last Updated 01/24/2019 10:37 AM
Project Title

2019 Roof Replacement at Furcolo Hall - Filed Sub-Bids

Physical Address View project details and contacts
City, State (County) Amherst, MA 01002   (Hampshire County)
Category(s) Single Trades
Sub-Category(s) HVAC, Plumbing, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,515,772
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description DCAM Certification Required
Details
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents