Last Updated | 02/23/2023 06:13 AM |
Project Title | Ceiling Renovations at Mitchell-Neilson Elementary School |
Physical Address | View project details and contacts |
City, State (County) | Murfreesboro, TN 37129 (Rutherford County) |
Category(s) | Education |
Sub-Category(s) | Elementary School |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $502,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Question Deadline 02/14/2023 at 2:00 PM CT Submit completed form to Asbestos.NESHAP.Program@tn.gov. Call (615) 532-6828 with any questions. Work under this Contract includes, but is not limited to, the following: 1. Erection of temporary fences, barricades, and other safety measures, as necessary, to protect school staff, visitors, and the public from the work and materials storage areas. 2. Temporarily relocate existing school furnishings as required to perform the work areas to designated storage areas as required to access the work areas. 3. Remove and store for reinstallation existing items mechanical and electrical items mounted in existing suspended acoustical tile ceiling. 4. Remove existing suspended acoustical ceiling tiles. 5. Temporarily support existing low voltage cables laying on top of suspended acoustical tile ceilings. 6. Temporarily support existing mechanical and electrical items attached to existing concealed spline ceilings and wood framing. 7. Remove existing suspended acoustical tile ceiling grid. 8. Remove existing concealed spline ceilings located above suspended ceiling, and nonstructural wood framing for concealed spline ceilings. 9. Abate existing asbestos containing water pipe insulation, and replace with new water pipe insulation. 10. Reinstall new steel ceiling joists at corridors for attachment of existing mechanical and electrical items previously attached to existing concealed spline ceilings and wood framing. 11. Install existing electrical and mechanical items previously attached to existing concealed spline ceilings and wood framing at corridors to new steel ceiling joists. 12. Support existing low voltage cables previously laying on top of existing suspended acoustical tile ceilings to a side wall or to the building structure with j hooks, cable ties, , clamps, or hangers, to comply with 2017 NEC Section 393.14. 13. Renovate existing electrical work uncovered after demolition as directed by Architect that is not in compliance with applicable electrical code. This work is to be performed under the cost allowance specified in Section 01 21 13 - COST ALLOWANCES. 14. Install new suspended acoustical tile ceiling system. 15. Reinstall items mounted in existing suspended acoustical tile ceiling system in their original location. 16. Relocate existing stored school furnishings to their original room. 17. At the conclusion of work, clean building to preconstruction condition. 18. Repair any existing construction damaged during the course of the work, including landscaping, lawn, sidewalks, and interior finishes shall be restored to preconstruction condition. Location- Mitchell-Neilson Elementary School 711 West Clark Blvd. Murfreesboro, TN 37129 |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |