Similar Projects
SR 11 over East Branch Martins Creek
Demolition, New Construction, Infrastructure
Conception
$1,175,000 CJ est. value
Kingsley, PA 18826

SR 11 over East Branch Martins Creek
Demolition, New Construction, Infrastructure
Conception
$1,175,000 CJ est. value
Kingsley, PA 18826

SR 247 over Dundaff Creek
Demolition, New Construction, Infrastructure, Renovation
Design
$1,601,000 CJ est. value
Clifford Township, PA 18421

SR 247 over Dundaff Creek
Demolition, New Construction, Infrastructure, Renovation
Design
$1,601,000 CJ est. value
Clifford Township, PA 18421

Michaels Hill Road Culvert Replacement and Wall Stabilization Project
Infrastructure
Bidding
$700,000 CJ est. value
Dimock, PA 18801

Newhart Road (T-784) Superstructure Replacement
Infrastructure
Bidding
$303,000 CJ est. value
Bridgewater Township, PA 18801

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Dirt and Gravel Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Franklin Township, PA 18822

Wright Road Bridge Replacement
Renovation
Results
$300,000 est. value
PA

Wright Road Bridge Replacement
Renovation
Results
$300,000 est. value
PA

I-81 Susquehanna Project - Susquehanna County
Infrastructure, Renovation
Pending Verification
$200,000,000 CJ est. value
New Milford, PA 18834

I-81 Susquehanna Project - Susquehanna County
Infrastructure, Renovation
Pending Verification
$200,000,000 CJ est. value
New Milford, PA 18834

SR 492 over Little Butler Creek
Infrastructure, Renovation
Conception
$1,405,000 CJ est. value
New Milford, PA 18834

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Jackson Township 2023 Contracted Paving
Infrastructure
Post-Bid
$200,000 CJ est. value
Jackson, PA 18847

Last Updated 09/28/2023 11:46 AM
Project Title

SR 2024 over Cape Pond Creek

Physical Address View project details and contacts
City, State (County) Kingsley, PA 18826   (Susquehanna County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For the Improvement of a Certain Section of State Route 2024, Sec P66 in Susquehanna County, Dimock Township. The Location of the Project is as Follows: From a Point Approximately 2 Miles East From the Interchange With Sr 0029 at Segment 0030 Offset 2881 (Station 79+00) to a Point Approximately 1.5 Miles West From the Intersection With Sr 2053 at Segment 0040 Offset 0130 (Station 81+70) Along Sr 2024 With a Total Work Area Length of 170 Feet (0.032 Miles). The Projects Scope of Work Includes the Repair of a Bridge Structures Structurally Deficient Wing Walls (Concrete Retaining Wall Replacement for Wing a and D) Over an Unknown Tributary to Meshoppen Creek on Sr 2024. A 22' Curb to Curb Structure Consisting of Two (2) Eleven Feet Travel Lanes. The Proposed Roadway Typical Section Will Match the Existing Criteria Over the Structure and Transition to the Roadway Approach Section. The Existing Roadway Approach Section Consists of Two (2) Eleven Feet Travel Lanes. Other Work Includes Roadway Approach Full Depth Bituminous Paving, Right Fascia Repairs, Excavation, E&s Control Measures, Rip Rap Replacement, Landscaping, Temporary Barrier, Temporary Traffic Control, Temporary Traffic Signals, Signing, Pavement Markings, Portion of Bridge Structure Removal, Temporary Excavation & Support and Other Miscellaneous Concrete Construction Work. Project Cost Range: $200,000.00 - $499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 34.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Miscellaneous Rehabilitation Work Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - SR 2024 over Cape Pond Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents