Similar Projects
By-Pass Pumps Maintenance
Bidding
Davie, FL

Removal, Repair and Re-Installation of Two Vertical Single End Suction Axial Flow Pumps and Right-Angle Gear Drives
Post-Bid
Coral Springs, FL

Transfer Pump Replacement
Post-Bid
Less than $1,735,000 est. value
Hallandale, FL 33009

West Water Treatment Plant High Service Pumps MCC Replacement
Results
Less than $320,000 est. value
Deerfield Beach, FL 33441

Boesch Submersible Turbine Pump Model 10HxH-1C (1 Stage)
Term Contract
Results
$10,475 to $31,425 est. value
Hollywood, FL 33022

Flygt Pumps Replacement/Repair Services
Post-Bid
Miramar, FL

Rebuilding of Two (2) Stormwater Water Lubrication Pumps
Results
Hollywood, FL 33025

Mechanical Integrity Testing for Deep Injection Wells
Results
Miramar, FL 33027

Supply and Delivery of Two (2) Split Case Horizontal Pumps
Results
Plantation, FL 33317

Mechanical Integrity Testing (MIT), Sawgrass Water Treatment Plant (WTP) Concentrate Well CW1
Results
Sunrise, FL

Installation of Irrigation Pump System
Results
Miramar, FL 33025

Access Structure and Wetwell Rehabilitation - Term Contract
Term Contract
Results
Plantation, FL

Supply and Delivery of Well Pump
Results
Plantation, FL 33317

Raw Water Well #9
Results
Hallandale, FL 33009

Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Results
Less than $175,000 est. value
Fort Lauderdale, FL 33301

Last Updated 01/13/2021 02:28 AM
Project Title

Regional Wastewater Treatment Plant Injection Well Mechanical Integrity Testing

Physical Address View project details and contacts
City, State (County) Plantation, FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of the Contract comprises the mechanical integrity testing of existing deep injection wells IW-1 and IW-2. The work set forth within these bid documents includes the furnishing of all labor, materials, equipment, services and incidentals for the testing of the wells. Maintenance of existing operations is mandated throughout the testing period. A. The Contractor shall furnish all labor, tools, supervision and equipment necessary to perform the work specified herein and as required for a complete installation, including surface preparation and painting. The Owner will provide the paint. B. After reinstallation of piping and installation of ball valve, the Contractor touch up paint on the ball valve, all reassembled piping joints and on other areas marred by contractor’s work activities. All areas requiring touch up paint shall first be properly prepared with hand or power tools.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents