Similar Projects
Southport Business Park - Phase I Infrastructure
New Construction - 675,000 SF
Conception
$2,750,000 est. value
Washington, PA 15301

Apex's North America Production Site
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
North Charleroi, PA 15022

Lanco Sheds
New Construction - 51,500 SF
Design
$1,500,000 est. value
New Holland, PA 17557

Flint Hill Farms Distillery
New Construction, Addition - 4,493 SF
Design
$600,000 est. value
Landenberg, PA 19350

Land Recycling and Environmental Remediation
Renovation
Bidding
Erie, PA

Gehr Plastics
Addition - 4,500 SF
Bidding by Invitation
Boothwyn, PA 19061

SGL Bell Jar Addition
Addition - 1,189 SF
Post-Bid
$670,000 est. value
Saint Marys, PA 15857

Medical Marijuana Growth and Processing Facility
New Construction - 54,000 SF
Post-Bid
$15,000,000 est. value
Olyphant, PA 18447

Medical Marijuana Growing and Processing Facility
New Construction - 85,700 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Duncannon, PA 17020

DFA New Wilmington Raw Receiving Renovation
Renovation - 6,100 SF
Construction
New Wilmington, PA 16142

Seakeeper Inc Expansion
Renovation - 180,000 SF
Pending Verification
Mohnton, PA 19540

Victaulic
New Construction - 400,000 SF
Pending Verification
$10,000,000 CJ est. value
Easton, PA 18045

Thermo Fisher Scientific
New Construction - 47,045 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Millersburg, PA 17061

Building 100
New Construction - 100,850 SF
Design
$1,000,000 est. value
Lancaster, PA 17601

Citterio USA Dry Aging Facility
Addition - 57,132 SF
Post-Bid
$4,000,000 to $6,000,000 est. value
Freeland, PA 18224

Last Updated 01/26/2021 02:08 PM
Project Title

Cigas Machine Shop

Physical Address View project details and contacts
City, State (County) Coatesville, PA 19320   (Chester County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method Construction Manager to Subcontract.
Project Status Construction Commenced November 2020, Construction Completion Expected June 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Manufacturing/Processing Plant, 93,150 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents