Similar Projects
Northpoint Church Parking Lot and Auditorium Expansion
New Construction, Addition - 17,775 SF
Conception
Toledo, OH 43623

Underground Utility Infrastructure Improvements - C340A7
Renovation, Infrastructure
Conception
$1,500,000 est. value
Toledo, OH 43606

West Central Avenue Apartments
New Construction, Infrastructure - 124,900 SF
Design
$34,000,000 CJ est. value
Toledo, OH 43606

West Central Avenue Apartments
New Construction, Infrastructure - 124,900 SF
Design
$34,000,000 CJ est. value
Toledo, OH 43606

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Uptown Waterline Extensions
Results
Maumee, OH

Underground Utility Infrastructure Improvements
Infrastructure
Results
$600,000 est. value
Toledo, OH 43606

Construction Management at Risk Services RFQ - Parking Lot Project 2021
Construction
$8,000,000 est. value
Toledo, OH 43609

Construction Management at Risk Services RFQ - Parking Lot Project 2021
Construction
$8,000,000 est. value
Toledo, OH 43609

Street Resurfacing and Reconstruction - Toledo
Infrastructure
Pending Verification
$5,440,000 CJ est. value
Toledo, OH 43604

Street Resurfacing and Reconstruction - Toledo
Infrastructure
Pending Verification
$5,440,000 CJ est. value
Toledo, OH 43604

Executive Parkway Restaurant
New Construction, Infrastructure
Conception
$1,000,000 est. value
Toledo, OH 43606

Irwin Road Chip Seal Work
Infrastructure
Design
$50,000 CJ est. value
Toledo, OH 43620

Maumee Bay Boardwalk Improvements - Ohio Department of Natural Resources
Infrastructure
Post-Bid
$5,700,000 CJ est. value
Oregon, OH 43616

Last Updated 04/10/2023 09:10 AM
Project Title

Cherry/Summit Roadway Reconstruction

Physical Address View project details and contacts
City, State (County) Toledo, OH 43604   (Lucas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $85,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Type Bid Response Types Line Items Bid Bond ODOT Project Paperwork (required) Signed Contract (required) Child Support Affidavits (required) Insurance Certificate (required) Bureau of Workers Comp Certificate (required) Tax Exempt Certificate (required) Additional Upload, if Necessary Additional Upload, if Necessary Bid Valid 90 Days Start/Delivery Date Upon Issued PO Project Duration 180 Days Bid Bond 5.00% Payment Bond 0.00% Performance Bond 100.00% Pre-Bid Meeting No This project will reconstruct 0.28 miles of pavement on Summit Street, from Jackson Street to Cherry Street, and Cherry Street, from Summit Street to the Maumee River. This includes removing and replacing the pavement, curb, and the drive approaches, as well as minor drainage improvements and streetscape enhancements. Bids for this project can only be accepted electronically. All lines shall be quoted. All bids must have the required paperwork and bid guaranty attached with this e-bid in order to be deemed responsive. If you are e-bidding and are using a check as the bid guaranty, the check must be received by the Division of Purchases and Supplies no later than the due date and time to be deemed responsive. The bid guaranty may be a bid bond or a certified check or cashiers check on a solvent bank. City forms must be filled out and attached to the bid: Acknowledgment and Acceptance of Conditions Contract Specifications; Toledo Municipal Income Tax Compliance; Public Utilities Compliance; Signed Contract by Vendor CEO/President; Certificates of Insurance; Current Workerd Compensation Certificate; Court-Ordered Child Support Affidavit; Independent Contractor PERS forms; and additional Insurance as Required. ODOT requires a DBE Utilization plan to be submitted prior to bid opening. The following items will be required prior to awarding the contract: The apparent low bidder must submit C-92s and a DBE Affirmation form to ODOT as well. Online Q&A Yes Q&A Deadline 02/15/2023 2:00 PM (EST)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents