Similar Projects
Ting Stadium Structure and Drainage Repair
Renovation, Infrastructure
Bidding
Holly Springs, NC 27540

Ting Stadium Structural and Drainage Repair
Infrastructure
Bidding
Holly Springs, NC 27540

Early Site Package of E-44 Hilltop Needmore Elementary School Project
Infrastructure
Sub-Bidding
Fuquay Varina, NC

Raleigh Green Stormwater Infrastructure Retrofits
Post-Bid
Less than $600,000 est. value
Raleigh, NC 27602

Stormwater Drainage Assistance - Chapel Hill Road Drainage Improvements
Post-Bid
Less than $317,000 est. value
Raleigh, NC 27607

Streambank Repairs
Results
Raleigh, NC 27604

Stormwater Drainage Assistance Program
Results
Less than $120,888 est. value
Raleigh, NC 27602

Pond Breach and French Drain Package of the E-51 Woods Creek Elementary School Project
Post-Bid
Cary, NC

Stream Bank Repairs
Results
Raleigh, NC 27601

Streambank Repairs (Formal)
Post-Bid
Raleigh, NC

Corrugated Metal Pipe for Stone Creek/Bear Garden Project
Results
Raleigh, NC 27699

Stormwater Drainage Assistance Program - 904 Wakestone Court
Post-Bid
Raleigh, NC

Culvert Maintenance
Results
Apex, NC

Sierra Drive Drainage Improvements
Post-Bid
Raleigh, NC 27603

Falls Lake Bulkhead Repairs
Results
$100,000 to $250,000 est. value
Wake Forest, NC 27587

Last Updated 11/18/2021 09:30 AM
Project Title

Stormwater Drainage Assistance Program - Bundle Project 3

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27612   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $381,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work of Bundle Project #3 will include the construction of two (2) Stormwater Drainage Assistance Projects, 5700 Edgedale Drive and 7314 Doverton Court. Work for the projects will consist of stream bank stabilization construction activities to repair and improve eroded stream channel’s sections on City’s permanent drainage easement. The construction activities will include but is not necessarily limited to clearing and grubbing; erosion and sediment control activities, stream channel excavation; removal of small embankment, removal of 30 and 36-inch pipes, removal and replacement of stormwater drainage structure, installation of new 48 and 54-inch RCP pipes, re-grading the channel banks in conjunction with the installation of rock bank protection, rock toe protection and soil lifts, furnish and install constructed Riffles, NCDOT Rip-Raps, riparian seed mix, rooted plant plugs, landscaping, topsoil, seeding, mulching and other related items.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents