Similar Projects
Remove and Replace Asphalt
Term Contract
Bidding
Eastover, SC

Full Depth Asphalt Patching - Richland
Infrastructure
Bidding
$600,000 est. value
Columbia, SC

Rehabilitation - Richland County
Post-Bid
SC

Raised Pavement Markers - District 1
Post-Bid

Carolina Crossroads Phase 2 - Broad River Road at I-20 Interchange
Results
SC

Enhancement - S-3054 Richland Co
Results
SC

County Line Trail Roadway Improvements
Post-Bid
$500,000 to $749,999 est. value
Columbia, SC

Asphalt and Concrete Repair and Restoration (IDC)
Results
$179,681 est. value
Columbia, SC

Mcentire Jngb Rnwy 14-32 Pavement Repair
Infrastructure
Post-Bid
Eastover, SC 29044

Rehabilitation - S-55 Richland Co
Results
SC

Paving Projects
Infrastructure
Post-Bid
$250,000 to $350,000 est. value
Columbia, SC 29212

Preservation - District 1
Results

Safety Improvement - US 1/S-1700
Infrastructure
Post-Bid
SC

Resurfacing Package R Project
Results
Columbia, SC

I-20/I-126/I-26 Corridor Improvements - Demolition
Demolition
Post-Bid
$620,000 to $650,000 est. value
Columbia, SC 29210

Last Updated 04/21/2022 07:01 AM
Project Title

Rehabilitation

Physical Address View project details and contacts
City, State (County) SC   (Richland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds and Insurance 1.000 Ls Traffic Control 1.000 Ls Removal & Disposal of Existing Pavement 2,931.000 Sy Unclassified Excavation 70.000 Cy Borrow Excavation 3,000.000 Cy Excavation for Shoulder Paving 1,225.050 Sta Hauling of Excavated Shoulder Material 1,225.050 Sta Maintenance Stone 111.750 Ton Hma Shoulder Widening Course 5,639.627 Ton Liquid Asphalt Binder Pg64-22 3,588.586 Ton Full Depth Asph. Pav. Patching 6" Unif. 400.000 Sy Full Depth Asph. Pav. Patching 8" Unif 10,175.000 Sy Full Depth Asph. Pav. Patching 10"Unif 600.000 Sy Milling Existing Asphalt Pavement 2.0" 361,170.000 Sy Milling Existing Asphalt Pavement (Variable) 6,490.000 Sy Milled-in Rumble Strip 24.500 Mi Hot Mix Asphalt Intermediate Course Type B 9,231.360 Ton Hot Mix Asphalt Surface Course Type B 33,944.586 Ton Hot Mix Asphalt Surface Course Type C 14,071.890 Ton Driveway Paving-surface Type C 867.125 Ton Full Depth Concrete Pavement Patch - 8" 245.000 Sy Permanent Construction Signs (Ground Mounted) 2,728.000 Sf 4" White Broken Lines -(Gaps Excluded)-fast Dry Paint 66,500.000 Lf 6" White Broken Lines -(Gaps Excluded)-fast Dry Paint 900.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 534,800.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 43,050.000 Lf 8"White Solid Lines(Crosswalk&channelization)fast Dry Paint 28,210.000 Lf 12" White Solid Lines - Fast Dry Paint 2,000.000 Lf 24" White Solid Lines (Stop/diagonal Lines)-fast Dry Paint 12,710.000 Lf White Single Arrow (Left, Straight, Right)-fast Dry Paint 134.000 Ea White Single Bike Lane Arrow (Lt, Straight, Rt)-fast Dry Paint 36.000 Ea White Word Message "Only"-fast Dry Paint 68.000 Ea White Combination Arrow(Str.& Rt.or Str.& Lt.)fast Dry Paint 22.000 Ea White Lane Drop Arrow (Left or Right)-fast Dry Paint 14.000 Ea Bike Lane Symbol - Fast Dry Paint 21.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 44,010.000 Lf 4"Yellow Solid Line(Pvt.edge&no Passing Zone)-fast Dry Paint 555,390.000 Lf 6" Yellow Solid Line on Curb/median - Fast Dry Paint 6,650.000 Lf 4" White Broken Lines(Gaps Excl.)thermoplastic- 90 Mil. 22,650.000 Lf 6" White Broken Lines(Gaps Excl.)thermoplastic- 90 Mil. 300.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 157,500.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 14,300.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 8,770.000 Lf 12" White Solid Lines - Thermo. - 125 Mil. 500.000 Lf 12in X 18in White Triang. Yield Bar (Gaps Exc)thermo-125mil 125.000 Lf 24" White Solid Lines (Stop/diag Lines)-thermo.-125 Mil 3,735.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 41.000 Ea White Word Message "Only" -thermoplastic - 125 Mil. 20.000 Ea White Combination Arrows(Str&rt.or Str<)thermo-125mil 7.000 Ea White Lane Drop Arrow(Lt.or Rt.)thermo-125mil 5.000 Ea 4" Yellow Broken Lines(Gaps Exc)thermoplastic - 90 Mil. 13,890.000 Lf 4" Yellow Solid Lines(Pvt.edge Lines) Thermo-90 Mil. 191,920.000 Lf White Bike Symbol - Hot Applied Preformed Thermoplastic - 90 Mils 7.000 Ea White Bike Lane Arrow - Hot Applied Preformed Thermoplastic - 90 Mils 12.000 Ea Permanent Clear Pavement Markers- Mono-dir.- 4"X4" 1,075.000 Ea Permanent Yellow Pavement Markers Mono-dir.- 4"X 4" Perm. Yel. 400.000 Ea Permanent Yellow Pavement Markers Bi-dir.- 4"X4" 2,750.000 Ea Plastic Curbing With Dual Post 40.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 850.000 Lf Furnish & Install 2.0" Schedule 80 Pvc Conduit 6,150.000 Lf Furnish & Install 2" Schedule 80 Hdpe Conduit (Directional Bored) 250.000 Lf Furnish & Install No. 14 Copper Wire, 4 Conductor - Gray 6,400.000 Lf Furnish & Install No. 14 Copper Wire, 8 Conductor (Gray) 250.000 Lf Furnish & Instl No. 14 Copper Wire,1-conductor for Loop Wire 19,600.000 Lf Sawcut for Loop Detector 6,350.000 Lf F&i-12"X12"X12"D.elec.flush Undgrd.enclos-(Str.poly.conc.)hd 50.000 Ea F&i-13"X24"X18"D.elec.flush Undgrd.enclos-(Str.poly.conc.)hd 10.000 Ea Concrete Curb and Gutter(1'-6") Vertical Face 35.000 Lf Detectable Warning Material 1,362.500 Sf Pedestrian Ramp Construction 2,725.000 Sy Surface Applied Detectable Warning 10.000 Sf Remove & Dispose Semi-rigid Gr Device 362.500 Lf Mt3 Leading End Treatment Tl3 8.000 Ea Mgs3 Gr Standard Shoulder 100.000 Lf Permanent Grassing for Non-permitted Resurfacing Projects 14.556 Acre Mowing 12.752 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents