Similar Projects
Y--NRM (Proj 546-19-104) DB Secure Medical Gas Farm
Design
$500,000 to $1,000,000 est. value
Miami, FL

Annual Contract for Weekly/Monthly Rental of Diesel By-Pass Pumps and Storage Tanks
Bidding
Pensacola, FL

Central County WRF - Generator Fuel Storage
Bidding
FL

Replace Fuel Tanks Patrick AFB FL
Post-Bid
$10,000,000 to $25,000,000 est. value
Cocoa Beach, FL 32931

Ramrod Pump Station Fuel System Improvements
Post-Bid
Key West, FL 33040

Pinkney Fuel Site Replacement Construction Management at Risk Services
Results
Sarasota, FL

Replacement of the Fuel System
Results
Wewahitchka, FL 32465

Lecanto Fuel Site Dispensers Vacuum Pump System Upgrades
Bidding
$72,000 est. value
FL

Two (2) Year Contract for Natural Gas Pipeline Cathodic Protection System Service and Maintenance
Term Contract
Post-Bid
Pensacola, FL 32502

Perdido Landfill 2019 Gas Collection and Control System (GCCS) Expansion
Results
FL

Diesel Generator Tank Replacement
Bidding
Tampa, FL 33619

Pre-Qualification of Vendors for Maintenance and Repair of Fuel Systems Equipment
Term Contract
Post-Bid
Less than $150,000 est. value
Belle Glade, Pahokee, West Palm Beach, FL

D.L. Tippin Tank Rehabilitation Ferric and Acid Tank Rehabilitation
Results
Less than $700,000 est. value
Tampa, FL 33604

Natural Gas Piping
Term Contract
Bidding
Fort Pierce, FL

Fuel Pump Dispenser at 1075 Ponce de Leon Boulevard
Post-Bid
Belleair, FL 33756

Last Updated 09/18/2020 03:09 PM
Project Title

NSU WWTP RAS Line Modification Project

Physical Address View project details and contacts
City, State (County) The Villages, FL 32162   (Sumter County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The intent of this project is to provide additional control of Return Activated Sludge to optimize treatment process at the facility and provide a higher quality effluent by changing the location RAS is introduced into the treatment process (headworks) to the Anoxic Basin. This project includes; but is not limited to, the installation of DIP, mag meters, vault, electronic actuators, gate valves and associated fittings to provide automatic control of RAS between treatment oxidation ditches.

Details

Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents