Last Updated | 04/07/2023 05:10 AM |
Project Title | US50A/US95A Sanitary Sewer Improvements |
Physical Address | View project details and contacts |
City, State (County) | Fernley, NV 89403 (Lyon County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work consists of performing or providing all labor, services, and documentation necessary to produce such construction and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. The Work generally includes, but is not limited to: Rehabilitation of Sanitary Sewer Manholes, Installation of a Precast Polymer Manhole, Connection of existing Sanitary Sewer pipe to new manhole, installing Forcemain Appurtenances including 4-inch tee with plug valves and temporary HDPE Bypass line, Trenching and Excavation, and Bypass Pumping. Project Category Code:Sanitary Sewer (Gravity), Sewer Inspection/Rehabilitation, Sewer Force Main, Manhole Rehabilitation, Sewer Re-Lining The Work to be performed under this Contract shall consist of furnishing all plant, tools, equipment, materials, supplies, and manufactured articles and furnishing all labor, transportation, and services, including fuel, power, water, and essential communications, and performing all Work or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The Work shall be complete, and all Work, materials, and services not expressly indicated or called for in the Contract Documents which may be necessary for the complete and proper construction of the Work in good faith shall be provided by the CONTRACTOR as though originally so indicated, at no increase in cost to the OWNER. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding Question Deadline 03/29/2023 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |