Similar Projects
Plug and Play
New Construction
Conception
Detroit, MI 48201

Pittsfield Fun Center
New Construction - 59,800 SF
Conception
$3,500,000 est. value
Ypsilanti, MI 48197

Concessions Building Improvements at Rolling Hills County Park
Bidding
Ypsilanti, MI 48197

Disc Golf Outdoor Pavilion Construction at Independence Lake Couty Park
Bidding
Whitmore Lake, MI 48189

Public Shade Plaza for Dix-Vernor Junction
Post-Bid
Dearborn, MI 48126

Renovation to Mckinley Community Center
Renovation
Post-Bid
Flint, MI

Construct Track Pavilion - Battle Creek ANGB
New Construction - 600 SF
Results
$25,000 to $100,000 est. value
Battle Creek, MI

Athletic Field Improvements
Results
Rochester, MI

Huron Mountain Club - Boardwalk Repair
Renovation - 4,300 SF
Construction
Big Bay, MI 49808

Indoor Recreational Airsoft Arena
New Construction, Renovation - 24,000 SF
Pending Verification
Westland, MI 48185

Rosa Parks & Clairmount Revitalization
New Construction
Pending Verification
Detroit, MI 48200

Western Up - Shooting Facility
Bidding
Lansing, MI

Charter Township of Redford Leisure Services Department Picnic Shelter Structure Installation Project
Term Contract
Post-Bid
Redford, MI 48240

Public Schools of Calumet-Laurium-Keweenaw - Fieldhouse Buildings at Agassiz Field
Results
Calumet, MI

Athletics Upper Fields Track Pavilion
Post-Bid
Rochester, MI 48309

Last Updated 10/12/2020 08:14 AM
Project Title

Orchard Beach State Park High Lake Level Modifications

Physical Address View project details and contacts
City, State (County) Manistee, MI 49660   (Manistee County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes, but is not necessarily limited to: disconnection of existing building utilities; relocation of the historic shelter building to a newly prepared foundation via a constructed roadway to the new foundation, and abandonment of old foundation; new bathroom interior construction, with new water service and sanitary sewer connections; reconstruction of stone terraces and stairs, plus new barrier-free pathways, and relocation of an existing water fountain; and restoration of all disturbed ground surfaces. The work also includes: replacement of an existing gabion basket shoreline revetment with a new armor stone revetment; replacement of the existing stormwater outfall within the revetment; repairs to the lake access stairway; and grading of an access road to the shoreline.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents