Similar Projects
Last Updated | 07/22/2022 08:04 AM |
Project Title | RFQ - Various Phase I/II Projects, Various Routes, Various Counties |
Physical Address | View project details and contacts |
City, State (County) | Dixon, IL 61021 (Lee County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Bridge, Maintenance, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $4,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Job No. P-92-013-23, Various Phase I/II Projects, Various Routes, Various Counties, Region Two/District Two. This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 27, 2022, at 10:30 AM at the Region Two/District Two Office in Dixon. Phase I and/or II engineering services are required for various projects throughout District Two. Work orders under the blanket agreement will be negotiated and authorized by the department on an as-needed basis. The estimated construction cost for these projects may range from $50,000 to $4,000,000. The estimated engineering fee for this project is $2,000,000. The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). After all responses have been evaluated, firms may be asked to make oral presentations during the week of July 18, 2022. The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 021 - RFQ - Various Phase I/II Projects, Various Routes, Various Counties |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |