Similar Projects
Comfort Inn Hotel
New Construction, Addition - 10,506 SF
Conception
Ocean City, MD 21842

Frederick Hotel
Renovation
Design
$29,000,000 est. value
Frederick, MD 21701

Salisbury University Housing Complex
New Construction - 323,371 SF
Design
$70,000,000 est. value
Salisbury, MD 21801

The Hub at College Park
New Construction - 187,617 SF
Post-Bid
Less than $500,000 CJ est. value
College Park, MD 20742

Restore Hyper Wellness and Cryotherapy
Build-Out
Post-Bid
$300,000 to $500,000 est. value
Baltimore, MD 21224

Shower Room Renovations Westminster Family Fitness Center
Renovation
Results
Westminster, MD 21157

CMAR Wellness Center Addition and Renovation
Renovation, Addition - 75,637 SF
Results
Less than $7,800,000 est. value
Dundalk, MD 21222

Holiday Inn Express
New Construction, Demolition - 57,000 SF
Construction
White Marsh, MD 21162

Four Seasons at Kent Island Phase II
New Construction - 26,566 SF
Construction
Centreville, Chester, MD 21619

Crunch Fitness Select
Build-Out
Pending Verification
$3,000,000 est. value
Timonium, MD

Sweitzer Lane Office Development
New Construction, Renovation - 120,904 SF
Pending Verification
$500,000 est. value
Laurel, MD 20707

The Standard At College Park
New Construction - 5,997 SF
Design
$25,000,000 est. value
College Park, MD 20740

Benson Gymnasium Foundation at Structural Design and Engineering Repairs
New Construction
Results
$500,000 to $1,000,000 est. value
Frederick, MD 21701

The Pennant
New Construction, Renovation
Construction
Baltimore, MD 21231

Snap Fitness
Renovation - 8,200 SF
Pending Verification
Annapolis, MD 21401

Last Updated 10/14/2021 01:34 PM
Project Title

Locker Room Renovations Westminster Family Fitness Center

Physical Address View project details and contacts
City, State (County) Westminster, MD 21157   (Carroll County)
Category(s) Entertainment/Recreation
Sub-Category(s) Fitness Center
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. Both Men’s and Women’s Locker Rooms 1. Replace counter tops to include 4 each undermount bowls using HDP countertops and porcelain bowls. 2. Install new faucets, traps, supply lines, and ADA trap covers on new bowls. 3. Install new outlets and outlet covers. 4. Install new soap dispensers and paper towel dispensers. 5. Install new poly toilet partitions using same locations as existing. 6. Install new toilet tissue dispensers and coat hooks. 7. Install 47 total single tier lockers 12’x24’x72. B. Women’s Locker Room Only: Install one new GFI outlet in women’s changing area. C. Men’s Locker Room Only: Replace changing room and entry way flooring with luxury vinyl flooring approved by owner

Details

Fitness Center, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents