Similar Projects
Construct Equipment Storage Facility (66' X 66') and Aircraft Hangar (66' X 66') at Ingalls Field Airport
Results
Hot Springs, VA 24445

Provide Erect T-Hanger
Results
Emporia, VA 23847

Battalion Complex
New Construction - 147,500 SF
Results
$100,000,000 to $250,000,000 est. value
Fort Eustis, Newport News, VA 23604

Building 51 Tenant Upgrades Project
Renovation - 16,000 SF
Construction
Roanoke, VA 24012

Smith Mountain Lake Airport
New Construction - 92,300 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Moneta, VA 24121

Aircraft Weather Shelters JBLE
Post-Bid
$1,000,000 to $5,000,000 est. value
Hampton, VA 23665

Repair Engine Maintenance and Egress Shops, Facility 752 JBLE
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Hampton, VA 23665

F22 Consolidated Operations and Maintenance Hangar (COMH), Langley AFB
New Construction
Design
$25,000,000 to $100,000,000 est. value
Hampton, VA 23631

Construct Hangar E And F Site
Results
Less than $549,940 est. value
Weyers Cave, VA

KOKV SE Side Hangar Project
New Construction - 314,600 SF
Post-Bid
Winchester, VA

Reported 08/08/2020 12:00 AM
Project Title

Fuel System Maintenance Hangar, Joint Base Langley-Eustis

Physical Address View project details and contacts
City, State (County) Hampton, VA   (Hampton City County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The new Fuel System Maintenance Hangar is a 26,749 SF building that will accommodate two F-22A aircraft for safe concurrent maintenance activities while providing proper clearances throughout the facility. The adjoining administration, storage and utility spaces will provide proper support to the mission. The new facility is to provide a state of the art hangar and support facility with ample amounts of natural day lighting and acoustical design treatments counteracting its close proximity to the flight line. The facility will feature two F22A maintenance work bays, sheltered in a high bay space, wrapped on three sides by a lower roofed structure for administration, support and utility spaces.

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents