Similar Projects
Last Updated | 09/09/2022 11:37 AM |
Project Title | Jamestown Civic Center Roofing Removal and Replacement Area B and D |
Physical Address | View project details and contacts |
City, State (County) | Jamestown, ND 58401 (Stutsman County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Stadium |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2022 |
Bids Due | View project details and contacts |
Estimated Value | $306,770 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project will consist of the following approximate quantities: Roofing Removal and Disposal of existing built-up roofing and Replacement with adhered EDPM System, removal of existing insulation where it is damaged and needs to be replaced, add additional insulation to meet the 2018 IECC (International Energy Conservation Code), removal and replacement of existing metal flashing. Digital copies of the Bidding Documents are available electronically for a fee of $30.00. These documents may be downloaded by selecting this project from the "Bid Documents" tab Any technical questions may be directed to Todd Langbehn at (701) 252-0234. The bid shall be accompanied by a Bidder's Bond in a separate envelope in the amount of five percent (5%) of the full amount of the bid, executed by the Bidder as Principal and by a Surety Company authorized to do business in North Dakota. If the Principal's bid is accepted by the OWNER and the contract awarded, the principal, within ten (10) days after the Notice of Award, will be required to execute and effect a contract in accordance with the terms of the principal's bid and any requirements and conditions of the OWNER. Bid and Bid Bond must be executed by a principal. The Bid Bond must identify the name and title of the individuals who executed the Bid Bond. Signatures by other than a president, vice president, or CEO, must be accompanied by sufficient evidence (duly executed meeting minutes, resolution, power of attorney, etc) to indicate that the signatory has the authority to bind the company or organization. No bid will be read or considered which does not fully comply with the above provisions as to Bond and Licenses, and any deficient bid submitted will be resealed and returned to the Bidder immediately. The OWNER retains the right to reject any or all of the bids submit!ted and to waive any informality in any bid and to hold all bids for a period not to exceed thirty (30) days from said date of opening and to hold the three low bids and bid securities for a period not to exceed sixty (60) days from said date of bid opening. The work on the improvements is to commence upon a date to be specified by the OWNER, notice of which will be given to the suc!cessful bidder ten (10) days in advance of the start of construc!tion. The Contractor will be required to commence construction, and in an approved sequence, complete the project by September 30, 2022. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |