Similar Projects
Kingsley House Painting and Restoration
Renovation
Bidding
$30,000 CJ est. value
Romulus, MI 48174

Cement Bricks and Blocks
Term Contract
Post-Bid
MI

PMC Contract for Concrete Patching on M-3, Chene to Van Dyke
Infrastructure, Alteration
Post-Bid
Detroit, MI

2021 City Street Sectioning
Results
$650,000 est. value
Riverview, MI

Concrete Patches, Us-12 Between Lotz to Heywood Pavt Repair
Alteration
Results
Taylor, MI

(PMC) for Concrete Patching on M-53 at Harper
Alteration
Post-Bid
Detroit, MI

Papp Park Pavilion Concrete Replacement
Alteration
Results
Taylor, MI 48180

Bid Package No. 7 Miscellaneous Improvements at Various Schools
Infrastructure, Alteration
Post-Bid
Lincoln Park, MI 48146

Concrete and Asphalt Cutting Services
Alteration
Results
MI

Two (2) Year Concrete Pricing
Term Contract
Post-Bid
Romulus, MI

Memorial Park Bandshell - Concrete Stage Area
Alteration
Results
Lincoln Park, MI 48146

Concrete Repairs at Bus Stops and Facilities
Term Contract
Post-Bid
Detroit, MI 48226

Concrete Patching and Drainage Structure Repairs
Infrastructure, Alteration
Results
Detroit, MI

Concrete (Trade Package 04A) 4238 Cortland
Renovation
Post-Bid
$55,000 CJ est. value
Detroit, MI 48204

Ready Mix Concrete 2022
Term Contract
Results
Livonia, MI

Last Updated 12/06/2022 01:03 PM
Project Title

RFP Construction Manager - Taxiway Yankee Reconstruction Phase II (South) for Detroit Metropolitan Wayne County Airport

Physical Address View project details and contacts
City, State (County) Romulus, MI 48242   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Wayne County Airport Authority (Airport Authority) is soliciting bids from general contractors, construction managers and other businesses for the Taxiway Yankee Reconstruction Phase II (South) (Project) at Detroit Metropolitan Wayne County Airport (DTW). This Project includes work associated with: the removal of approximately 53,000 square yards of Portland cement and asphalt airfield pavement, with associated electrical, drainage, signs, and utility work, and construction of approximately 63,000 square yards of new taxiway Portland cement pavement and 41,000 tons of asphalt pavement and base with associated electrical (85,000 linear foot of wire), drainage (15,000 linear foot of underdrain pipe), 55,000 cubic yards of earthwork, signs, and utility work, in accordance with the drawings, specifications and other Contract Documents. It is anticipated that this Project will start construction in the spring of 2023, and be completed during the construction season of 2023, and be partially funded through the federal Airport Improvement Program (AIP). (The Contract resulting from this solicitation is subject to Davis-Bacon and Related Acts Wage Requirements.) Open cut construction work shall be construed to mean work which requires the excavation of earth including industrial, commercial and residential building site excavation and preparation, land balancing, demolition and removal of concrete and underground appurtenances, grading, paving, sewers, utilities and improvement retention, oxidation, flocculation and irrigation facilities, and also including but not limited to underground piping,conduits, steel sheeting for underground construction, and all work incidental thereto, and general excavation. For all areas except the Upper Peninsula, open cut construction work shall also be construed to mean waterfront work, piers, docks, seawalls, break walls, marinas and all incidental work. Open cut construction work shall not include any structural modifications, alterations, additions and repairs to buildings, or highway work, including roads, streets, bridge construction General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Federally Funded - Insurance Required - Prevailing Wage Required - Security Badges Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Surety Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % Question Acceptance Deadline 10/26/2022 02:00 PM EDT Questions are submitted online No

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents