Similar Projects
LA 3213: Gramercy Bridge Rehabilitation
Infrastructure
Design
$50,000,000 CJ est. value
Vacherie, LA 70090

LA 3213: Gramercy Bridge Rehabilitation
Infrastructure
Design
$50,000,000 CJ est. value
Vacherie, LA 70090

Laurel Ridge Levee Extension
Infrastructure
Bidding
$3,000,000 CJ est. value
Lutcher, LA 70071

Laurel Ridge Levee Extension
Infrastructure
Bidding
$3,000,000 CJ est. value
Lutcher, LA 70071

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Rehabilitation of several existing roads in Washington Parish
Infrastructure
Post-Bid

Dr 4263 Pw 910 Paved Roads - Task Order No. 4
Infrastructure
Results
$4,500,000 est. value

La 3125: Left Turnlane at n King Ave
Infrastructure
Results
$500,000 to $1,000,000 est. value
LA

Formosa Plastics Sunshine Project
New Construction, Infrastructure
Pending Verification
$12,000,000,000 CJ est. value
Saint James, LA 70086

Formosa Plastics Sunshine Project
New Construction, Infrastructure
Pending Verification
$12,000,000,000 CJ est. value
Saint James, LA 70086

LA 70: Sunshine Bridge Emer Truss Repair
Infrastructure
Design
$500,000 CJ est. value
Saint James, LA 70086

Asphaltic Concrete Pavement Preservation 2022-2023
Infrastructure
Post-Bid
Convent, LA

2022 District 12, 13, 14 Road Improvements
Infrastructure
Results
$1,366,416 est. value

Loc Rd Over Borrow Pit(Blind Rv Bt Lnch)
Demolition, New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Convent, LA 70723

Lift Stations Backflow Preventative Maintenance Service
Renovation, Infrastructure
Post-Bid
Reserve, LA

Last Updated 12/09/2022 12:31 AM
Project Title

LA 70: Sunshine Bridge - LA 22

Physical Address View project details and contacts
City, State (County) Saint James, LA 70086   (Saint James County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As per the Owner the project has been Withdrawn. Editorial Content Team is actively seeking updated information Specbook: 2016 426-02, 426-03, 426-31 Description of work: clearing and grubbing, grading, milling asphalt pavement, class ii base course, subgrade treatment, drainage structures, pavement patching, asphalt concrete, precast concrete piles, concrete slab span bridge, portland cement concrete pavement, signalization, drilled shafts, intelligent transportation system, alternate aa1: asphalt concrete pavement; alternate aa2: portland cement concrete pavement, and related work. Parish(es): St. James Route(s): LA 70 Federal Number: H002424 Estimated Construction Cost: $30,000,000 to $50,000,000 All questions concerning the plans shall be submitted via the Electronic Plans Distribution Center known as Falcon. All submitted questions will be forwarded by email to the Project Manager and the Project Engineer. Questions submitted within a period of 96 hours prior to the advertised time for the opening of bids, excluding Saturdays, Sundays, and any other legal holidays, may not be answered prior to bidding. Falcon may be accessed via the Internet. From the home page, select BUSINESS Working With DOTD, then select Project Letting Info. On the Construction Letting Information page, select the link, DOTD Plan Room (Falcon); Login to Falcon (or request an ID if a first-time user). Once logged in, you will have access to view Project Information, submit a question concerning the project, and view the plans. To avoid any suggestion that a potential bidder is using the Falcon system to communicate with other potential bidders, DOTD will not post any question or any statement of fact or opinion not made for the purpose of seeking clarification of plans and/or specifications. Any non-questions posted on falcon will be limited to the statement of an issue considered unresolved by a previous DOTD response. LADOT - LA 70: Sunshine Bridge - LA 22 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents