Similar Projects
RFQ - Broadband Engineering Services - ARC POWER Initiative Broadband Expansion Project
Infrastructure
Conception
$2,700,000 CJ est. value
Princeton, WV 24740

Beechurst and 1st St Intersection Improvements - City of Morgantown
Infrastructure
Conception
$350,000 CJ est. value
Morgantown, WV 26505

Health Department Addition and Alterations
Addition, Demolition, Renovation, Infrastructure
Design
$3,000,000 CJ est. value
Martinsburg, WV 25403

Bethlehem Roadwork
Infrastructure
Design
$300,000 CJ est. value
Wheeling, WV 26003

GigaFactory
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Morgantown, WV 26505

Path Improvements
Infrastructure
Design
$496,000 est. value
Barboursville, WV

TAP Grant - Sidewalk-Bike Trail - City of Morgantown
Infrastructure
Conception
$350,000 CJ est. value
Morgantown, WV 26505

Parkersburg - Williamstown
Infrastructure
Design
$3,000,000 CJ est. value
Mineral Wells, WV 26150

Police Headquarters - Jefferson County
Addition, Demolition, Build-out, Infrastructure
Conception
$3,500,000 CJ est. value
Kearneysville, WV 25430

Beverly - Kings Run
Infrastructure
Design
$515,000 CJ est. value
Mill Creek, WV 26280

WVU Hospital Master Campus Plan - Phase 3
Addition, Demolition, Renovation, Infrastructure
Conception
$155,000,000 CJ est. value
Morgantown, WV 26505

USMC PFC D Marshall Mem Br
Demolition, New Construction, Infrastructure
Design
$6,110,000 CJ est. value
Mineral Wells, WV 26150

5 Star Car Wash / Hurricane
New Construction, Infrastructure
Conception
$700,000 CJ est. value
Hurricane, WV 25526

Westmoreland +2
Infrastructure
Design
$1,080,000 CJ est. value
Huntington, WV 25704

Keller Field
New Construction, Infrastructure
Conception
$782,608 CJ est. value
Shepherdstown, WV 25443

Last Updated 08/14/2023 08:07 AM
Project Title

EWP Streambank Restoration, Preston and Tucker County

Physical Address View project details and contacts
City, State (County) Terra Alta, WV 26764   (Preston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $74,449 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Aug 07, 2023 Contract Award Number: 12FPC323P0082 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: S3YRDFHNV7C3 Contractor Awarded Name: Esther & Company 4:14, LLC Contractor Awarded Address: Jenkins, KY 41537 USA Base and All Options Value (Total Contract Value): $74,449.98 The USDA Farm Production and Conversation (FPAC) Operations Branch, Acquisition Division is issuing a solicitation on behalf of USDA Natural Resources Conservation Service (NCRS) for work to restore and stabilize a section of two streambanks using rock riprap at Buffalo Creek and Licking Creek in Preston and Tucker County, West Virginia. Both streambanks have eroded to the point of failure adjacent to homes from severe storms that impacted the area on September 1st, 2021. The performance time to complete the described work and all subsidiary items is 10 days per parcel, which includes weekends and built in weather days. Subsidiary items include Channel Clearing and Shaping, Pollution Control, Seeding, Sprigging and Mulching, Mobilization and Demobilization, Removal of Water, Excavation, Earthfill, Steel Reinforcement, Contractor Quality Control, and Geotextile. The work consists of the construction of streambank stabilization practices on two sites as follows: Parcel 1 - Preston County, Buffalo Creek Work will consist of restoring and stabilizing approximately 80 linear feet of stream channel on one (1) residential property in Preston County, West Virginia. This site is between Saint George and Rowlesburg on Cheat Valley Hwy (Rt.72). The contractor will remove accumulated sediment in the channel, install rock rip rap to stabilize channel banks, and grade and seed disturbed areas adjacent to the channel to provide positive drainage and vegetative cover. Parcel 2 - Tucker County, Licking Creek Work will consist of restoring and stabilizing approximately 88 linear feet of stream channel on one (1) residential property in Tucker County, West Virginia. This site is between Saint George and Rowlesburg on Licking Creed Road. The contractor will remove accumulated sediment in the channel, install rock rip rap to stabilize channel banks, and grade and seed disturbed areas adjacent to the channel to provide positive drainage and vegetative cover. The solicitation is a Total Small Business Set-Aside. Interested contractors must be registered as Active and must complete the annual representations and certifications electronically via the System for Award Management (SAM) at http://www.sam.gov in order to be eligible for award. All necessary permits and land rights have been acquired. A firm-fixed price construction contract is anticipated under Simplified Acquisitions Procedures (SAP). FAR Part 13 an 36 apply. A bid bond in the amount of 20% of the bid price is required to be submitted with bids. There will be no formal bid opening. A Request for Quote (RFQ) is being solicited. Award will be made to the lowest priced, responsive offeror. Payment and Performance Bonds in the amount of 100% of award amount will be required within 7 days of award by the successful offeror. A formal site showing will be held on Thursday, July 6, 2023 at 10:00 am local time. All interested parties will meet at the City Park in Rowlesburg, West Virginia. Magnitude of construction between $100,000 and $250,000. Any questions should be submitted in writing by Wednesday, July 12, 2023 at 2:30 pm local time to Amber Maestri at amber.maestri@usda.gov. Quotes shall be submitted by Monday, July 24, 2023 at 2:30 pm local time to Amber Maestri at amber.maestri@usda.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents