Last Updated | 12/27/2022 12:36 AM |
Project Title | Garage Replace Roof |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53205 (Milwaukee County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,100 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnish labor, material and service necessary to remove/replace garage roof at 2125 West Cherry Street, Milwaukee, WI 53205, as per the following scope: Note: Contractors shall perform work in accordance with all lead and asbestos removing procedures including, but not limited to, the containment and removal of materials on the ground. Contractor shall provide a dumpster for the containment of debris at commencement of project. Bagging is not acceptable. Contractor will be responsible for any damages done to lawn, or to neighbor's property. Site should be cleaned up DAILY. Storage of materials on site is not allowed. Contractor is responsible for providing a power source. Overall job is to be professional and done in a workmanlike manner. You are strongly encouraged to attend a walk-thru with the Manager and/or Maintenance to ensure the responsiveness of your bid and meet the scope of work. If you desire to visit the property, contact the Housing Manager, Kelly Duncan, 414-286-5797, or Kelly.Duncan@hacm.org to schedule an appointment. ROOF 1. Safeguard property from falling objects coming from the roof. 2. Remove existing shingles, drip edge, and any damaged or rotted roof sheathing and/or deck board on garage. 3. Contractor to replace any rotted roof sheathing, and properly prepare surface for roofing material. Contractor also to address/repair fascia at NW corner behind gutter prior to re-roofing. 4. Dispose of any cable lines, antenna and satellite dishes, etc. 5. Install new drip edge on eaves. 6. Install engineered roof barrier/membrane. GAF Shingle Mate or equivalent compatible with chosen roofing system. 7. Install starter strips at base of roof and roof eaves. Work shall commence within 5 business days of award of contract. Work shall be completed within 3 weeks ofstart date, weather permitting. Questions may be directed to Stacey Shaw at 414-286-2942 at the Housing Authority or emailed to sshaw@hacm.org |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |