Similar Projects
Last Updated | 01/05/2022 09:52 AM |
Project Title | 88 Connector Transmission Main |
Physical Address | View project details and contacts |
City, State (County) | Easley, SC 29642 (Anderson County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Replacement of the existing water line along Highway 81 and Old Greenville Highway Extension with a 16 inch water line. The transmission main will be approximately 8,200 linear feet of ductile iron pipe between the Lake Road Pump Station and the Highway 88 Tank. 2. Cleaning and Painting the Lake Road Pump Station. 3. Replacement of a control valve on Highway 81 with a pressure reducing valve. 4. Addition of a pressure reducing valve on Highway 17 along with its associated vault. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |