Similar Projects
Last Updated 01/05/2022 09:52 AM
Project Title

88 Connector Transmission Main

Physical Address View project details and contacts
City, State (County) Easley, SC 29642   (Anderson County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Replacement of the existing water line along Highway 81 and Old Greenville Highway Extension with a 16 inch water line. The transmission main will be approximately 8,200 linear feet of ductile iron pipe between the Lake Road Pump Station and the Highway 88 Tank. 2. Cleaning and Painting the Lake Road Pump Station. 3. Replacement of a control valve on Highway 81 with a pressure reducing valve. 4. Addition of a pressure reducing valve on Highway 17 along with its associated vault.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents