Similar Projects
Compton Community College Student Housing
New Construction
Conception
$69,490,000 est. value
Compton, CA 90221

UC Berkeley Upper Hearst & Goldman School of Public Policy
New Construction
Conception
Berkeley, CA 94720

Fire Station 10 Dormitory Renovation
Renovation
Results
$1,000,000 est. value
Oakland, CA 94610

Hornet Commons at California State University Sacramento
New Construction
Design
$150,000,000 est. value
Sacramento, CA 95811

Topaz at San Diego State University Apartments
New Construction, Build-Out - 12,000 SF
Design
San Diego, CA 92104

Travis AFB Dorm Renovation
Renovation
Design
$10,000,000 to $25,000,000 est. value
Travis AFB, CA

Trade Subcontractors for Faculty and Staff Housing Project
New Construction, Renovation - 30,000 SF
Post-Bid
$14,000,000 est. value
Sacramento, CA

Jesus Center Camp Fire Housing
New Construction
Pending Verification
Chico, CA 95928

New Student Housing Collaborative Design Build
New Construction
Bidding
$30,000,000 est. value
Fresno, CA

Cazadero Camp Jensen Dormitory
New Construction - 1,431 SF
Results
$596,000 est. value
Cazadero, CA 95421

Dana Point Surf Lodge
New Construction - 59,274 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Dana Point, CA

Reported 03/11/2022 02:27 PM
Project Title

Student Housing Phase IV and Dining Commons

Physical Address View project details and contacts
City, State (County) Carson, CA   (Los Angeles County)
Category(s) Residential
Sub-Category(s) Dormitory
Contracting Method Competitive Bids.
Project Status Schematic Drawings
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes 600 beds for Student Housing Phase IV with additional beds for Resident Advisors and a Dining Commons for student residents of Phase III and IV. To provide approximately 90,000 of assignable square feet (ASF) with a gross area of 145,000 square feet (GSF) for Student Housing Phase IV and 14,000 of assignable square feet (ASF) with a gross area of 21,000 square feet (GSF) for Dining Commons. The building would be positioned north of existing Student Housing Phase III and would have a loading dock for food delivery and trash collection access from International Avenue. The 600 beds for Student Housing Phase IV building will be designed to have single, double, triple and quadruple bed residential units with common study rooms, laundry facilities and recreational areas. Residential advisors (30) will have their own rooms. The Dining Commons will consist of between 400 to 500 seats, multiple food stations/options, an all - electric kitchen, refrigeration and freezers, outdoor patio seating area on the ground floor and on the upper level. There will be limited offices for food service administration. The project shall connect to the central plant chiller and will have a transformer and emergency generator enclosure, and trash/recycling enclosures. Site improvements shall include landscaping, exterior lighting, building and wayfinding signage, access from fire lanes, fire hydrants, access for food delivery and trash collection, and an outdoor shaded seating area for the Dining Commons. DVBE Incentive. Trustees require the successful proposer to achieve three percent (3%)

Details

180,000 SF - Dormitory, Approximately 90,000 SF New Construction, Dormitory, Approximately 145,000 SF New Construction, Dormitory, Approximately 14,000 SF New Construction, Dormitory, Approximately 21,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents