Similar Projects
AMR Water Meter Replacement
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Live Oak, FL 32064

Mechanical Maintenance/Repair Continuing Services
Term Contract
Sub-Bidding
Fort Myers, FL 33919

PHCD Boiler Inspections Preventive Maintenance and Repair Services Parts
Post-Bid
$80,000 est. value
Miami, FL 33138

Maintenance of Town Fountains
Post-Bid
Palm Beach, FL

Resins for Per Fluorinated Treatment System
Term Contract
Results
Stuart, FL 34994

Dyal Groundwater Filters #2 IMS Cap and Media Replacement
Results
Less than $233,928 est. value
Christmas, FL 32709

Mechanical Contractor Continuing Services
Term Contract
Sub-Bidding
Orlando, FL 32801

NS-3 High Energy Piping (HEP) Non-Destructive Examination (NDE) Project
Alteration
Post-Bid
Jacksonville, FL

Gymnasium Heating Hot Water for Ernest Ward Middle School
Results
Pensacola, Walnut Hill, FL 32568

MDC North Campus Buildings 3000, 5000 & 8000 Mechanical Upgrades
Alteration
Post-Bid
$3,500,000 est. value
Miami, FL 33167

Walk-In Cooler/Freezer Replacement
Results
Less than $155,915 est. value
Saint Petersburg, Tarpon Springs, FL 34688

Water Softener Replacement
Alteration
Post-Bid
Largo, FL 33778

SW Chiller Plant Condensation Corrections
Results
Less than $250,000 est. value
Gainesville, FL 32608

Escambia County Boiler PM
Term Contract
Post-Bid
Pensacola, FL 32502

Filter Backwash Drain Improvements at the John A Buckley Water Treatment Plant
Results
$1,569,940 est. value
Melbourne, FL 32934

Last Updated 09/08/2022 12:02 PM
Project Title

DeLand Campus Building 3 Motor Control Center

Physical Address View project details and contacts
City, State (County) Deland, FL 32720   (Volusia County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Daytona State College is seeking bids from qualified contractors to replace the aging Motor Control Center at the DeLand Campus Building 3. Work is not to begin prior to December 17, 2022 and must be completed by January 3, 2023. All equipment currently running off the existing Motor Control Center must be operational on the new Motor Control Center. Details and requirements needed by the College are provided herein. Question Acceptance Deadline 09/09/2022 02:00 PM EDT - Contractors License Required - FOB Destination - Installation Required - Insurance Required - Warranty Information Required

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents