Similar Projects
Columbia Co 2021 Crack Seal
Infrastructure
Bidding
$200,000 to $499,999 est. value

Bath Pike - PA 329 to Hollow Rd
Infrastructure
Bidding
$2,500,000 to $4,999,999 est. value
PA

2020 Paving Bids
Post-Bid
Nazareth, PA 18064

Paving Crew Hourly Rate
Post-Bid
Palmer, PA 18043

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Newburg Community Park Recreation Trail
Results
Nazareth, PA 18020

D&L Trail Development (North Catasaqua Borough)
New Construction
Construction
$1,449,105 est. value
North Catasauqua, PA

2021 Road Projects
Infrastructure
Bidding
Pen Argyl, PA 18072

2020 Seal Coat
Post-Bid
Easton, PA 18080

Northampton County Government Center Streetscape
Results
Easton, PA

River Road Roadway and Embankment Repairs
Infrastructure
Bidding
Mount Bethel, PA

Bituminous Asphalt Materials
Post-Bid
Nazareth, PA

In Place Paving on Various Road
Results
Martins Creek, PA 18063

Resurfacing of Franklin and McKinley Streets
Infrastructure
Bidding
Roseto, PA 18013

Bituminous Pavement Overlay
Post-Bid
Wind Gap, PA 18091

Last Updated 06/24/2021 03:32 PM
Project Title

In-Place Paving and Milling

Physical Address View project details and contacts
City, State (County) Palmer, PA   (Northampton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In-Place Paving and Milling (Approximate Quantities) of NORTHAMPTON ST (T-883) SALES ST (T-719), STONES CROSSING ROAD (T-940), DANFORTH DR. (T-964) MCFADDEN DR. (T-975) 1. 692 Tons Superpave 9.5mm Scratch Course 0.3-3 million ESALs 2. 1,844 Tons Superpave 12.5 mm Wearing Course 0.3-3 million ESALs 3. 3,552 Lineal Feet- 4" wide Single White Edge Line w/ Glass Beads 4. 2,800 Lineal Feet- 4" Yellow Two-way left turn channelization 5. 132 Lineal Feet- 24" wide Stop Bar/White Thermal Plastic 6. 445 Lineal Feet- 6" wide Crosswalk/White Thermal Plastic 7. 1,185 Lineal Feet 4" Double Yellow Center Line w/ Glass Beads 8. 245 Lineal Feet- 4" White Skip Lines/ 35 FT cycle, 10 FT line 9. 3 Each- STRAIGHT ARROW/ Thermal Plastic 10. 8 Each Legend "ONLY" / Thermal Plastic 11. 3 Each RIGHT ARROW / Thermal Plastic 12. 8 Each LEFT ARROW / Thermal Plastic 13. 15,368 Square Yards- Full width milling at 2 1/2 " Deep 14. 66 Tons Superpave 9.5mm Scratch Course 0.3- 3 million ESALs 15. 176 Tons Superpave 12.5mm Wearing Course, 0.3-3 million ESALs 16. 330 Lineal Feet- 4" Double Yellow Center Line w/ Glass Beads 17. 35 Lineal Feet- 24" White STOP Bar /Thermal Plastic 18. 200 Lineal Feet- 6" White Crosswalk / Thermal Plastic 19. 1,467 Square Yards- Full width milling at 2 1/2 " Deep 20. 100 Square Yards- Base Repair- Remove and replace with 4 1/2 " Superpave 25mm Base Course, 0.3-3.0 million ESALs 21. 881 Tons Superpave 9.5mm Scratch Course 0.3-3 million ESALs 22. 1,763 Tons Superpave 9.5mm Wearing Course 0.3-3 million ESALs 23. 220 Lineal Feet 4" Single White Lane Line w/ Glass Beads 24. 5,335 Lineal Feet 4" Double Yellow Center Line w/ Glass Beads 25. 32 Lineal Feet- 24" White STOP Bar/ Thermal Plastic 26. 0 Lineal Feet 6" White Crosswalk/ Thermal Plastic 27. 1 Each LEFT ARROW / Thermal Plastic 28. 1 Each RIGHT ARROW/ Thermal Plastic 29. 1 Each STRAIGHT ARROW/ Thermal Plastic 30. 3 Each Legend "ONLY" / Thermal Plastic 31. 19,583 Square Yards Full width milling at 2" Deep 32. 100 Square Yards Base Repair Remove and replace w/ 4 1/2 " Superpave 25mm Base Course 0.3-3.0 million ESALs 33. 487 Tons Superpave 9.5mm Scratch Course 0.3-3 million ESALs 34. 1,297 Tons Superpave 12.5mm Wearing Course 03-3 million ESALs 35. 2,432 Lineal Feet 4" Double Yellow Center Line w/ Glass Beads 36. 55 Lineal Feet 24" White STOP Bar/Thermal Plastic 37. 10,812 Square Yards- Full width milling at 2 1/2 " Deep 38. 535 Tons Superpave 9.5mm Scratch Course 0.3-3 million ESALs 39. 1,427 Tons Superpave 12.5 mm Wearing Course 0.3-3 million ESALs 40. 2,790 Lineal Feet 4" Double Yellow Center Line w/ Glass Beads 41. 155 Lineal Feet 24" White STOP Bar/ Thermal Plastic 42. 11,894 Square Yards Full width milling at 2" Deep 43. 100 Square Yards Base Repair Remove and replace w/ 4 1/2 " Superpave Base Course 0.3-3.0 million ESALs At 1:00 p.m.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents