Similar Projects
McNamara Terminal Domestic Arrivals Level Bird Remediation
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Detroit, MI 48242

Fitness Equipment
Term Contract
Sub-Bidding
Garden City, MI 48135

Ross House 2nd Floor and Attic Insulation
Post-Bid
Dearborn, MI 48124

Recreation Center Entry Construction
Alteration
Post-Bid
Detroit, MI

Design/Build Contract for Incineration Complex Fire Repairs
Results
Detroit, MI 48209

Mcnamara Parking Deck Elastomeric Coating at Detroit Metro Airport
Results
Detroit, MI 48242

Mariam Outreach Center / Livonia
New Construction, Infrastructure - 25,000 SF
Pending Verification
$6,450,000 CJ est. value
Livonia, MI 48152

Auditorium Curtain Replacement
Alteration
Post-Bid
Lincoln Park, MI

Spray Foam Insulation
Results
Detroit, MI

FPM - Furnish and Install Acoustical Panels at the STEM Innovation Learning Center - 2021
Alteration
Post-Bid
Detroit, MI

Interior Concaved Surface of the Bandshell
Results
Lincoln Park, MI

Prentis Water Filtration - 2022
Alteration
Post-Bid
Detroit, MI 48202

Lakes House Grill Bar and Fireplace Refinishing
Alteration
Results
Taylor, MI 48180

Ceiling Tile Replacement
Alteration
Post-Bid
Detroit, MI

Smart Locker for the Henry Ford Centennial Library
Alteration
Results
Dearborn, MI

Last Updated 08/04/2022 11:31 PM
Project Title

Taylor Recreation Center Track Flooring

Physical Address View project details and contacts
City, State (County) Taylor, MI 48180   (Wayne County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Finishes/Interior, Fitness Center
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work The City of Taylor is accepting proposals from qualified contractors to removal and installation of new track and LVT flooring at Taylor Recreation Project completion date of November 11, 2022 Track Floor Remove and dispose of existing floor and cove Check integrity of existing floor Prep floor per manufacture specifications Installation of ECOsurface ECOfit or equivalent 8.2mm Shock and sound absorbent Slip resistant wet and dry Installation of new cove base and transitions Track surface will be one color and stretching areas doorways will be another color. Track must be stripped and marked with walking and running lane. Please provide sample of proposed product Second Floor Rental Area Removal and disposal of existing floor and cove Prep floor per manufacture specifications Installation of LVT tile with 25 year warranty Installation of new cove base and transitions Wear layer must be a minimum of 22 mils thick and overall thickness should be 0.12" / 3mm. Please provide sample of proposed product Scope of Work The City of Taylor is accepting proposals from qualified contractors to removal and installation of new track and LVT flooring at Taylor Recreation . Project completion date of November 11, 2022 Track Floor Remove and dispose of existing floor and cove Check integrity of existing floor Prep floor per manufacture specifications Installation of ECOsurface ECOfit or equivalent 8.2mm Shock and sound absorbent Slip resistant wet and dry Installation of new cove base and transitions Track surface will be one color and stretching areas doorways will be another color. Track must be stripped and marked with walking and running lane. Please provide sample of proposed product Second Floor Rental Area Removal and disposal of existing floor and cove Prep floor per manufacture specifications Installation of LVT tile with 25 year warranty Installation of new cove base and transitions Wear layer must be a minimum of 22 mils thick and overall thickness should be 0.12" / 3mm. Please provide sample of proposed product

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents