Last Updated | 02/28/2023 02:35 PM |
Project Title | Multipurpose Field Site Preparation |
Physical Address | View project details and contacts |
City, State (County) | McHenry, MD 21541 (Garrett County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $122,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Carpet ready date has been changed from July 19, 2023, to August 6, 2023. Substantial completion is moved from August 14, 2023, to August 28, 2023. Contractor will be able to take over the baseball field on May 1, 2023. The installation of the Synthetic Turf surfacing will be by separate contract and has been bid separately. The selected Contractor shall coordinate with the synthetic turf installer to complete the project within the stated time frame. The selected synthetic turf installer will be identified at the Pre-Proposal meeting. Work for this Project shall prepare the Multipurpose Field to receive the synthetic turf as provided and installed by separate contract, as identified within the Contract Drawings and Specifications. The Contractor shall provide all materials, labor, equipment, and services necessary for a complete installation of the field substrate surface. B. Perform Work under a stipulated fee contract with Owner in accordance with the General Conditions of Contract for Construction. C. Preparation of base field shall be prepared by separate contract. General: It is the intent of Garrett College to award one contract to the Site Contractor to prepare the base to install the synthetic turf surface as indicated within the contract drawings, specifications, and addenda. Site preparation is the focus of this contract with oversight of the synthetic turf surface. Synthetic turf field surface shall be installed by separate contract. Both contracts will run concurrently and will require close coordination by both to meet the Owner's completion date. Question due date changed from December 20, 2022, to COB December 27, 2022. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |