Project Title | Forest Trails Wastewater Treatment Plant (WWTP) Consolidation Project |
Physical Address | View project details and contacts |
City, State (County) | Isle of Palms, SC 29451 (Charleston County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $18,000,000 to $20,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Headworks’ facility, including mechanical screening and odor control associated. 2. Anoxic/Pre-aeration and membrane bioreactor basins including diffused aeration system, blowers, and recycle pumps/wet well. 3. Membrane Bioreactor (MBR) basins and covered equipment area. 4. A two-story Building to provide the following: a. Location of blowers, pumps, and other equipment. b. Storage and feed for sodium hypochlorite, caustic soda, etc. c. Office, storage, meeting/training room. d. Electrical/MCC Room associated equipment. e. Mechanical Room associated equipment. f. Restroom. g. laundry a0rea. 5. Monorail beam and hoist system for MBR filters. 6. Odor control facility for the plant. 7. Screening’s dumpster and slab for secondary screening. 8. MBR filter wash pad on grade. 9. Primary Screening. 10. Reuse water pumping. 11. Associated process and non–process yard and plant piping. 12. Associated site pavement, grading and related. 13. One diesel engine generator with fuel tank, mechanical and electrical accessories, and access walkway. 14. Associated instrumentation and control equipment. 15. Equalization (EQ) basins. 16. Associated communications system including Programmable Logic Controller (PLC), Input/Output (I/O) modules and Scada interface. 17. Associated electrical equipment and work. 18. Associated grounding and lightning protection systems. 19. Site and facility lighting. 20. Procedures, materials, and equipment required to continue process operations during construction such as Bypass Pumping, and those required for installations such as Dewatering. 21. Demolition of portions of existing plant. 22. Landscape buffers/plants. 23. MBR membranes, equipment and related. 24. Pumping and related piping. 25. Piles and other structural supports. 26. UV disinfection system. 27. Sludge dewatering system. 28. Effluent pumping. 29. Flow monitoring. |
||||||||||||||||||||||||||||||||||||||||||
Details | 1 Sewage Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |