Similar Projects
Potato Cut Project - Shasta County
Infrastructure
Conception
$1,000,000 est. value
Montgomery Creek, CA 96065

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Sacramento and Court Street Parking Lot Project
Infrastructure
Bidding
$250,000 est. value
Redding, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Construct Retaining Wall, Replace Concrete Sidewalk and HMA Paving
Infrastructure
Post-Bid
$2,640,000 est. value
CA

HMA overlay, replace AC surfacing and shoulder backing
Infrastructure
Results
$1,570,000 est. value
CA

Asphalt Rubber Binder Seal Coat, Cold Plane AC Pavement and HMA
Infrastructure
Results
$1,810,000 est. value
CA

Construct Retaining Wall Replace Concrete Sidewalk and HMA Paving
Infrastructure
Post-Bid
$2,640,000 est. value
CA

Construct HMA Structural Shoulder Sections and Modify Signal Systems
Infrastructure
Results
$880,000 est. value
CA

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Cottonwood Active Transportation Trunk Line Express
Infrastructure
Post-Bid
$14,200,000 est. value
Cottonwood, CA

CA Flap Red 2017(3) Sacramento Island Trail
Term Contract
Results
$1,600,000 est. value
Redding, CA

Bechelli Lane Improvements (ATP)
Infrastructure
Results
$8,649,000 est. value
Redding, CA 96002

Riverland Drive (2H16) Shoulder Widening
Infrastructure
Results
$1,635,000 est. value
Redding, CA 96002

Reported 07/13/2022 10:50 AM
Project Title

Anderson Park Concrete Repair - PW1718 - City of Carson

Physical Address View project details and contacts
City, State (County) Anderson, CA 96007   (Shasta County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $1,422,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Anderson, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot. Limited accessibility upgrades compliance. Concrete reconstruction, asphalt concrete pavement reconstruction, new curbs, steps, and added walkways. This Project Is in Included in the City of Carson's Fy 2022 - 2023 Capital Improvement Plan (CIP). As of July 12, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated from 2022 to 2024.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents