Similar Projects
General Contractor Services for the Layton City Fire Station 54
New Construction
Bidding
$1 to $3,310,000 est. value
Layton, UT

New Construction of Fire Station 62
New Construction - 15,000 SF
Post-Bid
Less than $6,000,000 est. value
Spanish Fork, UT

Moab BLM Fire Station
- 7,067 SF
Post-Bid
Moab, UT

Moab Wildfire Station
New Construction - 5,000 SF
Results
$1,500,000 to $3,000,000 est. value
Moab, UT 84532

Airport Fire Stations 11 and 12 Roof Replacement/Solar Panels
Results
Salt Lake City, UT 84122

Murray City Fire Station 18 Construction Services
Construction
Murray, UT

Construction Manager/General Contractor Services - Police and Fire Station 64
New Construction - 35,000 SF
Construction
Less than $11,200,000 est. value
South Jordan, UT

South Davis Metro Fire Station 84 Facility and Parking Upgrade
Post-Bid
Bountiful, UT 84010

Remodel of Ogden City Fire Station 4
Renovation
Results
Ogden, UT 84401

DFCM Construction-Standard Low Bid-DHS/DJJS Dixie Area Detention Center Renovation-19426430
Renovation
Construction
$1,200,000 est. value
Hurricane, UT 84737

Fire Station 52 CM/GC Services
Post-Bid
$4,750,000 to $5,000,000 est. value
American Fork, UT 84003

Elmo Town - Fire Station Addition
Addition - 2,000 SF
Results
Less than $400,000 est. value
Price, UT 84521

Draper City Police Building Remodel
Renovation
Construction
$200,000 to $250,000 est. value
Draper, UT 84020

Torrey Fire House
Addition - 9,300 SF
Post-Bid
Fruita, UT 84775

Fire District Office - Milford
Results
Less than $586,481 est. value
Milford, UT 84751

Last Updated 09/11/2020 06:08 PM
Project Title

Town of Wales Fire Station

Physical Address View project details and contacts
City, State (County) North Salt Lake, Wales, UT 84054 (Davis, Sanpete Counties)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The structure is 85 feet by 80 feet (6,800 square feet in area) and will be a premanufactured steel building supplied by C. O. Building Systems. The building will have a reinforced concrete floor. There will be 3 drive through bays for fire engines. There will also be an office, storage area, 2 restrooms, and a meeting room inside the building that will be frame construction. There will be a limited use mezzanine area above the office and meeting room area. A septic system will also need to be installed.

Details

1 Fire/Police Station, 1 Story Above Grade, 6,800 to 9,000 SF New Construction Buildings.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents