Similar Projects
Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Post-Bid
Less than $1,600,000 est. value
Lake Placid, NY 12946

Bulwagga Bay Campground Shoreline Assessment and Remediation Plan
Post-Bid
Port Henry, NY 12974

Honey Hill Road Outfall Channel Restoration
Results
Fort Plain, NY

Zukowski Drive Drainage Improvements Phase 1
Results
Less than $300,000 est. value
Garnerville, NY

West Street Drainage Outlet Remediation
Post-Bid
Harrison, NY 10528

Gooseberry Creek Revitalization Strategy – Creek Walk Park
Results
Less than $300,000 est. value
Tannersville, NY

Corrugated Metal Pipe Arches
Post-Bid
Fort Edward, NY 12828

Monkey Run Road Culvert Replacement
Results
Port Crane, NY

Culvert and Underdrain Pipe and Tubing W/ Arches Bands and Accessories
Term Contract
Post-Bid

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Reconstruction of the Newark Street Drainage Culvert
Term Contract
Post-Bid
Lindenhurst, NY 11757

Replacement of Hannibal Street over Meadow Brook
Term Contract
Results
Fulton, NY 13069

Culvert Replacement Project CR23 (Brook Road) Over Slade Creek, Saratoga Springs
Post-Bid
Ballston Spa, NY 12020

Richbell Road Drainage Improvements at Ridgeway to Ethelridge Road
Results
White Plains, NY

Corrugated Metal Pipe Arches and Aluminized Pipe Arches
Post-Bid
Owego, NY 13827

Last Updated 01/23/2020 09:09 AM
Project Title

Rewiring, Drainage and Miscellaneous Work at Locks CS-2 and 3 on Cayuga Seneca Canal

Physical Address View project details and contacts
City, State (County) Seneca Falls, NY   (Seneca County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate the electrical distribution system Rehabilitate the lock controls system Rehabilitate the telephone, public address and video systems Improve site drainage Apply waterproofing membrane to the lock house foundation walls Fabricate and install two steel stair landings Steel repairs on middle bridge pier columns and elevated walkway support bracket Limited asbestos abatement at the lock house Erosion and sediment control Work zone traffic control Coordination with the hydroelectric facility located north of the project site Coordination with Canal Maintenance & Operations Restoration of all disturbed surfaces

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents