Similar Projects
Presbyterian Healthcare Services - Support and Patient Rooms
New Construction, Addition - 454,000 SF
Design
$10,000,000 CJ est. value
Albuquerque, NM 87106

New Hospital Tower Bid Package 3 - Phase III
New Construction
Sub-Bidding
Albuquerque, NM

Ophthalmology Clinic Remodel
Renovation
Post-Bid
Less than $5,200,000 est. value
Albuquerque, NM

Y--IDIQ Multiple Award Construction Contract for Renovation, Repair and New Construction of Medical Facility Projects at Various Government Installations in CA, AZ, NV, UT, CO, and NM
New Construction, Renovation
Post-Bid
$2,000,000 to $20,000,000 est. value

USAF Engineering Infrastructure Repair (EIR) MATOC
Results
$100,000 to $250,000,000 est. value

USAF Engineering Infrastructure Repair (EIR) MATOC
Results
$100,000 to $250,000,000 est. value

Construction Services for the Care Detox Addition and Renovation
Renovation, Addition - 13,200 SF
Construction
$3,529,433 est. value
Albuquerque, NM 87108

Covenant Health Hobbs Hospital
New Construction - 108,500 SF
Construction
Hobbs, NM 88240

UNMH Main Hospital 5ACC Renovations
Renovation
Post-Bid
Albuquerque, NM 87106

UNM SRMC 1st Floor Emergency Department Renovations
Post-Bid
Albuquerque, NM 87144

Sandoval Regional Medical Center - Center for Excellence in Orthopedic Surgery and Rehabilitation Project
Post-Bid
Albuquerque, NM

Phase II Demo, Turnkey Drilled Piers
Post-Bid
Albuquerque, NM 87106

Renovation of Pharmacy Hazardous Drug Prep & IV Clean Rooms - Building 2000
New Construction, Renovation, Demolition
Post-Bid
$250,000 to $500,000 est. value
Gallup, NM

CT Scanner Room Renovation
Renovation - 1,086 SF
Post-Bid
Rio Rancho, NM 87144

Reported 03/05/2021 12:00 AM
Project Title

Construction Manager for Phase III Hospital

Physical Address View project details and contacts
City, State (County) Albuquerque, NM   (Bernalillo County)
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work: Turnkey Cast In Place Concrete Structure.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Blinds, Casework, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents