Similar Projects
Design-Build Tunnel System Project - River Renew Super Structure
Design
$300,000,000 est. value
Alexandria, VA 22314

Chandlers Mill Pond Dam
Post-Bid
$199,999 est. value
Henrico, VA

Statewide Special Structures
Post-Bid

Gunston Corner at Laurel Hill
Results
$3,895,000 est. value
Fairfax, VA

On-Call Dam Maintenance Services
Term Contract
Results
Charlottesville, VA 22902

Aldie Mill Historic Dam Repair
Results
$300,000 est. value
Aldie, VA 20105

Tunnel Cleaning Services
Term Contract
Results

Burruss Hall Tunnel Top Repair
Results
Blacksburg, VA

Bland Boulevard Bridge Deck Expansion Dam Repairs - Structure No. 121- 8017
Results
Newport News, VA

Installation of Three (3) Flood Water Remote Monitoring Stations On Two (2) Flood Control Dams and One (1) Flood Control Dam
Results
Culpeper, VA 22701

Annual Maintenance the Hidden Lake Community and Dam
Term Contract
Results
VA

Sugar Hollow Dam - Rubber Dam Replacement
Results
Charlottesville, VA

Old Turner Steam Tunnel Repair
Results
Blacksburg, VA

Last Updated 06/25/2020 04:13 PM
Project Title

Graham Creek Dam #1 Improvements

Physical Address View project details and contacts
City, State (County) Madison Heights, VA 24572   (Amherst County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $78,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed hereunder shall include the furnishing of all labor, materials, tools, transportation, supplies, equipment and appurtenances necessary for the complete and satisfactory replacement/rehabilitation/replacement of dam related valves/valve stems/trash rack for the Amherst County Service Authority. The work shall include, but is not limited to, installation of an underwater track rack for the existing low flow valve, replacement of the low flow valve stem system/actuator system, and replacement of a valve stem system for one of the water treatment intake valves, as shown on the plans and as described in the contract drawings. In addition, this project could also include replacement of the low flow sluice gate valve system itself if found to be inoperable during construction.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents