Reported | 06/28/2022 11:51 AM |
Project Title | Shermer Road - Maple Avenue to Techny Road - Village of Northbrook |
Physical Address | View project details and contacts |
City, State (County) | Northbrook, IL 60062 (Cook County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Conceptual Design, Construction Start Expected January 2025 |
Bids Due | View project details and contacts |
Estimated Value | $1,764,352 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site work and paving for a road / highway in Northbrook, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. The concrete segments on Shermer Road between Maple Avenue and Techny Road have been surveyed and an estimated number of concrete panels have been identified for replacement. Deferring replacement of these deteriorated panels will result in more advanced degradation of roadway, including pavement failures and increased reconstruction and rehabilitation costs in the future. Staff has also determined that the curb and gutter on the west side of the roadway requires significant repairs. This work will be coordinated with the FY 2024/2025 asphalt reconstruction and rehabilitation project to minimize potential disruption to local residents and businesses. If the Village is unable to secure grant funding for the asphalt project, both projects will be rescheduled to occur in tandem later. For concrete street projects, the Village assumes an annual 3% cost adjustment based on historical price increases. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of June 27, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |