Similar Projects
Asphalt Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Concrete Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Post IAF Airline Realignment GC/CM - Bid Package IB - Concrete
Renovation
Sub-Bidding
$125,000 CJ est. value
Seattle, WA 98164

Lindbergh High School Modernization and Additions - BP-3.1 Concrete
Alteration
Post-Bid
$1,475,000 est. value
Renton, WA 98058

Beacon Hill Station Emergency Fan 6 Wire Run
Alteration
Post-Bid
$200,000 est. value
Seattle, WA 98144

Satellite Transit System (STS) Fiber Project
Renovation, Infrastructure
Results
$2,735,100 CJ est. value
Seattle, WA 98164

Auburn Way S South Side Sidewalk
Infrastructure
Results
$645,591 CJ est. value
Auburn, WA 98092

Rebid Green Lake Community Boathouse
Demolition, Renovation, Infrastructure
Construction
$8,367,000 CJ est. value
Seattle, WA 98103

Gustaves Manor Envelope Upgrade
Renovation
Design
$3,446,000 CJ est. value
Auburn, WA 98002

Technology Center Water Mitigation - Phase 3
Renovation
Post-Bid
$410,000 CJ est. value
Kirkland, WA 98034

Delridge PF Turf Replacement & Accessibility Improvements
Infrastructure
Results
$2,855,000 CJ est. value
Seattle, WA 98106

Airport Office Renovation Project
Renovation
Post-Bid
$575,000 CJ est. value
Renton, WA 98057

Bellevue Botanical Garden Yao Garden Pavilion
New Construction, Infrastructure
Results
$122,100 CJ est. value
Bellevue, WA 98005

Runway 16-34 (17-35) Rehabilitation & Associated Improvements
Infrastructure
Post-Bid
$3,057,289 CJ est. value
Auburn, WA 98002

Sandy Cove Park Bank Protection Phase 1
Infrastructure
Results
$434,215 CJ est. value
Snoqualmie, WA 98065

Last Updated 01/08/2024 06:02 PM
Project Title

RFP Contractor - Sea-Tac International Airport Baggage Optimization Phase 3

Physical Address View project details and contacts
City, State (County) Seattle, WA 98158   (King County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2024
Bids Due View project details and contacts
Estimated Value $18,538,870 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 3 concludes the Baggage Optimization Program (BOP) allowing for complete baggage flexibility to check in any bag into any ticket counter and be delivered to any airplane. It also accommodates for passenger volume growth and meets TSA safety mandates. This phase will tie-in all the south end systems to centralized screening, including the International Arrivals Facility (IAF), and finalize the sortation and ticket counter connections. The anticipated project construction duration is 36 months. The estimated preconstruction services value is three million six hundred thousand Dollars ($3,600,000) excluding sales tax. The estimated MACC is two hundred ninety one million five hundred thousand Dollars ($291,500,000) excluding sales tax. The Port of Seattle is an Equal Opportunity Employer and encourages diverse business to participate. In support of the WMBE community, the Port of Seattle has established a WMBE utilization requirement. The WMBE Goal is 4%

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents