Similar Projects
Farmstone Meadows Residential Subdivision
New Construction, Infrastructure
Conception
$38,300,000 CJ est. value
Willow Springs, NC 27520

Farmstone Meadows Residential Subdivision
New Construction, Infrastructure
Conception
$38,300,000 CJ est. value
Willow Springs, NC 27520

Clayton Village Center Mixed Use Development
New Construction, Infrastructure - 80,000 SF
Design
$25,000,000 CJ est. value
Clayton, NC 27520

Whitley Townes
New Construction, Infrastructure
Design
$32,200,000 CJ est. value
Smithfield, NC 27577

Popeyes / Clayton
New Construction, Infrastructure - 2,528 SF
Bidding
$600,000 CJ est. value
Clayton, NC 27520

Pine Level Wastewater I&I Remediation
Infrastructure
Bidding
$300,000 CJ est. value
Selma, NC 27576

RFQ D/B - Timothy G. Broome Water Treatment Plant Expansion
Addition, Demolition, Infrastructure
Post-Bid
$55,200,000 CJ est. value
Smithfield, NC 27577

Hangar Site Development and Parking Lot Expansion - Rebid
Demolition, Infrastructure
Post-Bid
$4,445,852 CJ est. value
Smithfield, NC 27577

FY 2021 Road Rehabilitation Project
Results
$1,013,373 est. value
Clayton, NC

Firearms Training Facility Berm Repair
Alteration
Results
Four Oaks, NC 27524

NC 96 Four Oaks Economic Development Water Main Extension
Infrastructure
Construction
$1,724,038 CJ est. value
Smithfield, NC 27577

Wilder's Market
Demolition, New Construction, Infrastructure - 4,500 SF
Pending Verification
$4,000,000 CJ est. value
Clayton, NC 27520

Wilder's Market
Demolition, New Construction, Infrastructure - 4,500 SF
Pending Verification
$4,000,000 CJ est. value
Clayton, NC 27520

Woodleaf
New Construction, Infrastructure
Conception
$191,700,000 CJ est. value
Smithfield, NC 27577

River Mews Estate
New Construction, Infrastructure
Design
$275,000,000 CJ est. value
Clayton, NC 27520

Last Updated 03/22/2023 08:36 AM
Project Title

Woodall Dairy Road Industrial

Physical Address View project details and contacts
City, State (County) Benson, NC 27504   (Johnston County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $63,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 117,000 square foot industrial building. As of September 12 2022, construction has not started. Construction is anticipated to start in the fourth quarter of 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

117,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents