Similar Projects
PA 531: Depot Road, Section 4
Infrastructure
Conception
$1,275,000 CJ est. value
Harborcreek, PA 16421

PA 531: Depot Road, Section 4
Infrastructure
Conception
$1,275,000 CJ est. value
Harborcreek, PA 16421

Poplar Street Townhomes
New Construction, Infrastructure - 15,436 SF
Design
$6,000,000 CJ est. value
North East, PA 16428

SR 8009 Ramp C over I-79
Infrastructure
Design
$75,000 CJ est. value
Erie, PA 16501

Harbor Road, Aaron Road, and South Shore Drive Water Main Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Erie, PA 16501

PA 699 Edinboro Road Bridge over Walnut Creek Branch
Demolition, New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Asbury, PA 16506

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Site Improvements at Erie County 911 Building
Infrastructure
Post-Bid
Erie, PA 16509

Superpave Leveling Course
Results
Girard, PA

Wilson Road 2021 Improvement Project
Infrastructure
Results
North East, PA

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Erie 2022 Bridge Shotcrete Group
Infrastructure, Renovation
Design
$380,000 CJ est. value
Erie, PA 16504

Holly Acres Estates - Well 2 Connection
Infrastructure
Bidding
$400,000 CJ est. value
Erie, PA 16509

Snow Plowing, Removal, Salting and Ground Maintenance
Term Contract
Post-Bid
Erie, PA

West 8th Street Corridor Improvements
Infrastructure
Results
$2,500,000 to $4,999,999 est. value
Erie, PA

Last Updated 01/05/2023 12:02 AM
Project Title

SR 19: I-90 to Rotunda Dr

Physical Address View project details and contacts
City, State (County) Summit Township, PA 16441   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $2,830,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

US 19, from Interstate 90 to Rotunda Drive Summit Township, Erie County Resurfacing As of January 05, 2023, the project is in development stage. Anticipated letting date is March 01 2024. PennDOT SR 19: I-90 to Rotunda Dr *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents