Similar Projects
Pittsburgh Theological Seminary Phase 2 - 3 Interior Loop Road
New Construction
Conception
Pittsburgh, PA 15206

2022 Storm Sewer Repair
Infrastructure
Bidding
Bethel Park, PA

2022 Storm Sewer CCTV and Cleaning Project
Infrastructure
Bidding
Bethel Park, PA

Lucerne Avenue Storm Sewer Replacement
Post-Bid
McKnight, PA 15237

Demolition and Site Clearance
Demolition
Post-Bid
Ebensburg, PA 15931

Phase 2 Site Improvements
Results
Cresson, PA 16630

Oliver Road Improvements
Results
Edgeworth, Sewickley, PA 15143

Pittsburgh Airport Innovation Campus Site Development Phase 2 at Pittsburgh International Airport
Infrastructure
Construction
Pittsburgh, PA 15231

2022 Stormwater Improvements - Pond Retrofits
Infrastructure
Bidding
Baldwin, PA

Brodhead Road Corridor Planning Study in Beaver County
Renovation
Post-Bid
Beaver, PA 15009

Welcana Drive Stormwater Management Project
Results
Fairview, PA 16415

Glen Terrace Improvement Project
Infrastructure
Bidding
Mount Penn, PA 19606

2021-2026 NPDES Municipal Separate Storm Sewer Systems
Term Contract
Post-Bid
Fairless Hills, PA 19030

2020 Roadway and Storm Sewer Improvements
Results
Pittsburgh, PA 15227

Park Road Storm Sewer Project
Infrastructure
Bidding
Boyertown, PA 19512

Last Updated 02/02/2022 11:05 AM
Project Title

Remington Basin Improvements and Penn Wynne Park Bio-Swale

Physical Address View project details and contacts
City, State (County) Wynnewood, PA 19096   (Montgomery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work The work at each location includes, but are not limited to, clearing and grubbing; excavation and grading; tree removal; removal of invasive plantings; new plantings; bituminous pavement replacement; temporary erosion and sediment control measures; temporary stream diversion; and site restoration. In addition at Penn Wynne Park, are new stormwater structures and pipes, boulder wall, and fencing.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents