Similar Projects
Delta Water Tunnels / California WaterFix Project / Delta Conveyance Project
New Construction, Infrastructure
Conception
$82,687,000 CJ est. value
San Francisco, CA 94102

Delta Water Tunnels / California WaterFix Project / Delta Conveyance Project
New Construction, Infrastructure
Conception
$82,687,000 CJ est. value
San Francisco, CA 94102

425 Broadway Mixed-Use Development
New Construction, Infrastructure - 18,735 SF
Design
$23,000,000 CJ est. value
San Francisco, CA 94133

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

SFMTA Parking Enforcement Headquarters Project
LEED Certification, New Construction, Infrastructure
Bidding
$49,500,000 CJ est. value
San Francisco, CA 94102

AT T Mobility, LLC Install New Wireless Telecommunications Antennas
Alteration
Post-Bid
San Francisco, CA 94109

Existing Wireless Telecommunications Facility Modifications
Alteration
Post-Bid
San Francisco, CA 94132

Better Market Street - Phase 1
Infrastructure
Results
$24,000,000 est. value
San Francisco, CA 94158

PW Various Locations Curb Ramps No. 10
Infrastructure
Results
$608,829 CJ est. value
San Francisco, CA 94103

Howard Street Mixed-Use
New Construction, Infrastructure - 117,400 SF
Construction
$20,000,000 CJ est. value
San Francisco, CA 94103

Porsche TI / San Francisco
Renovation, Infrastructure - 70,902 SF
Construction
$2,000,000 CJ est. value
San Francisco, CA 94103

One Oak
New Construction, Infrastructure - 370,930 SF
Pending Verification
$120,000,000 CJ est. value
San Francisco, CA 94102

3rd Street Residential Development
New Construction, Infrastructure
Pending Verification
$17,365,000 CJ est. value
San Francisco, CA 94124

Presidio Yard Modernization Project - San Francisco Municipal Transportation Agency
New Construction, Infrastructure
Conception
$800,000,000 CJ est. value
San Francisco, CA 94103

California Campus - San Francisco University High School
Demolition, New Construction, Infrastructure - 47,710 SF
Design
$23,500,000 CJ est. value
San Francisco, CA 94115

Last Updated 07/24/2023 11:07 AM
Project Title

RFQ D/B - Kansas and Marin Street Wet Weather Conveyance Tunnels

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94124   (San Francisco County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $16,000,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As part of its Sewer System Improvements Program (SSIP), the SFPUC is proposing the Project to improve the areas sewer system performance during wet weather. The neighborhood surrounding the intersection of Kansas and Marin Streets has historically been subject to flooding during moderate to heavy storms. The City has identified and analyzed various solutions to the flooding challenges and completed an Alternatives Analysis Report (AAR) and a Conceptual Engineering Report (CER) to meet the Projects needs. This proposed Project will provide an auxiliary sewer (an 8-foot diameter tunnel, approximately 900 feet long) that provides additional conveyance capacity and serves as a connection between an existing 12.5-foot x 6.5-foot reinforced concrete box sewer under Marin Street and another 20-foot x 30-foot reinforced concrete box sewer (the Contract C Box) inside the SFPUCs property, Lot 31. The proposed auxiliary sewer would allow wet weather flows to enter the Contract C Box earlier, thereby, lowering the hydraulic grade line (HGL) of the Marin Street sewer. Based on the findings and results of the hydraulic analysis performed, the elements described below would meet the proposed project needs. ESTIMATED COST $12,500,000 to $16,000,000 Deadline for Candidates to Submit RFQ Questions* ......................................................... August 20, 2021 Deadline for Candidates to Object to RFQ Terms ............................................................... August 20, 2021 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents