Similar Projects
Water Treatment Plants and Storage Facilities
New Construction
Design
Athens, WV

RWCC Water Storage Tank Replacement
Term Contract
Design

Mountaintop Beverage Water Storage Tank Project
Infrastructure
Bidding
Morgantown, WV 26501

Water Treatment Facility Renovations Project - Contract No 1
Renovation
Post-Bid
Grantsville, WV

Wastewater Treatment Plant Maintenance Building Project
Infrastructure
Post-Bid
Stephenson, WV

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Sterling Water Treatment Tanks or Equivalent
Infrastructure
Post-Bid
Green Bank, WV 24944

World-Wide Water Storage Tank Remediation
Term Contract
Results

Mod Branch Reservoir Rehabilitation
Infrastructure
Post-Bid
Welch, WV

Replace Product Recovery Tank
Results
$250,000 to $500,000 est. value
Martinsburg, WV 25405

Replace Underground Oil Storage Tank
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Romney, WV 26757

Cumberland Heights Water Storage Tank
Results
New Cumberland, WV

Water Storage Tank
Infrastructure
Post-Bid
$200,000 est. value
WV

Water Treatment Facility Improvements
Results
Less than $2,687,250 est. value
WV

Last Updated 02/04/2022 10:12 AM
Project Title

WTP Backwash Basin and Water Storage Tank Improvements

Physical Address View project details and contacts
City, State (County) Parkersburg, WV   (Wood County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of backwash basin at Water Treatment Plant, rehabilitation of South Reservoir; demolition of old South Reservoir; and water storage tank improvements at five locations in the distribution system.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents