Similar Projects
Jasper Parkway South
Infrastructure
Design
Prescott Valley, AZ 86314

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Bidding
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

Chip Seal FY 2021-2022
Infrastructure
Bidding
$1,041,630 est. value
Chino Valley, Iron Springs, Paulden, Prescott, Yarnell, AZ

AZ FTFS 104(1) Mingus Mountain
Post-Bid
$400,000 to $1,000,000 est. value
AZ 86326

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Y--Badger Springs Recreation Site Roads
Results
$150,000 to $250,000 est. value
Black Canyon City, AZ 85324

System Enhancement-Other Enhancements
Results

Design-Build Services for Verde Connect Road, SR 260 to Cornville Road
Post-Bid
Prescott, AZ 86305

Verde Valley School Road Overlay
Results
$562,200 est. value
Prescott, AZ 96305

Supply or Supply and Deliver Hot Asphaltic Concrete
Post-Bid
Prescott, AZ

2019-2020 Chip Seal
Results
Less than $947,300 est. value
Prescott, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Pavement Rehabilitation
Results
Less than $2,210,000 est. value
AZ

Road 2 North Paving Improvements Project
Post-Bid
$800,000 est. value
Chino Valley, AZ

2019-2020 Overlay
Results
$957,000 est. value
Prescott, AZ

Reported 06/25/2021 12:00 AM
Project Title

Rubberized Chip Seal Pavement Preservation

Physical Address View project details and contacts
City, State (County) Prescott, AZ   (Yavapai County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $3,132,300
Plans Available from County Agency - 06/08/21
Owner View project details and contacts
Architect View project details and contacts
Description

Work for this project includes furnishing of all labor, materials, equipment, fixtures, and services required for the placement of a rubberized chip seal and fog seal on Iron Springs Road and Kirkland Valley Road. Project length is approximately 27.74 miles, and the total estimated quantity of area to receive the rubberized chip seal is approximately 548,456 square yards. Total estimated quantity of fog seal coat is estimated at 54,846 gallons. Four bridges are to be treated with an epoxy chip seal (approximately 21,856 square feet total). Other associated work includes restoring pavement markings and installing 216 linear feet of preformed thermoplastic rumble bars.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents