Similar Projects
Dickey's BBQ Pit #LA-2038
Renovation - 2,400 SF
Construction
$30,000 to $300,000 est. value
Chalmette, LA 70043

HMGP Canal Crossing Project
Infrastructure
Results
$1,186,500 CJ est. value
Chalmette, LA 70043

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

2022 District 7, 9 Road Improvements
Infrastructure
Results
$2,493,427 CJ est. value
Mandeville, LA 70448

Removal of Sunken Dolphin and 54 Inch Diameter Lower Intake Pipe
Infrastructure
Post-Bid
$1,250,000 CJ est. value
Chalmette, LA 70043

Church's Texas Chicken #11510
New Construction - 1,429 SF
Post-Bid
$950,000 est. value
Chalmette, LA 70043

LA 46 at Weinberger Road Intersection
Infrastructure
Design
$2,500,000 CJ est. value
Saint Bernard, LA 70085

Louisiana International Terminal Container Facility
Addition, Demolition, New Construction, Infrastructure
Design
$1,800,000,000 CJ est. value
Violet, LA 70092

LA 46 Raising at Florissant Levee
Infrastructure
Design
$1,000,000 CJ est. value
Violet, LA 70092

St. Bernard Parish Government Sewer and Water Maintenance Contract
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Chalmette, LA 70043

Nunez Community College Bookstore
New Construction, Infrastructure
Post-Bid
$390,000 CJ est. value
Chalmette, LA 70043

E Genie Street at Corinne Canal Canal Crossing Replacement
Infrastructure
Post-Bid
$820,000 CJ est. value
Chalmette, LA 70043

Paris Road Washateria
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Chalmette, LA 70043

Judy, Lena, Angelique, and Old Jail Park Playground Renovations
Infrastructure
Results
$761,441 CJ est. value
Chalmette, LA 70043

Jean Lafitte Pkwy : LA 39 - Hermitage Dr
Infrastructure
Design
$5,000,000 CJ est. value
Chalmette, LA 70043

Last Updated 06/21/2023 04:00 PM
Project Title

Wendy's / Meraux

Physical Address View project details and contacts
City, State (County) Meraux, LA 70075   (Saint Bernard County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a new restaurant. As of June 21, 2023, this project is in the early planning stages, and is seeking approvals from St. Bernard Parish. An architect and a general contractor have been selected, however, their information has not been provided at this time. A firm timeline has not been announced, however, construction is unlikely to begin prior to fourth quarter of 2023.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents